Commissioning

1.  Contact the centre control room to authorise a flow-switch test.
2.  Ensure the Zonecheck red and green valves are in the open position (see fig 1).
3.  Now remove access plug (air vent) on the end of the Zonecheck pump .
4.  Using an appropriate screwdriver turn the shaft clockwise and anti-clockwise to check 

the free movement of the shaft and impeller (see fig 2), replace the access plug.

5.  Attach hosepipe to yellow vent valve (see fig 1) on the Zonecheck. Now carefully open 

the vent valve on the Zonecheck unit to remove the air from the Zonecheck pipework, 
allow water to drain to make sure all air is bled from the unit. Then close vent valve and 
replace plug.

6.  Now connect a hosepipe to the test valve at the furthest point on the zone or use the 

yellow test/drain valve provided on the Zonecheck unit (see fig 1).

7.  Discharge water through the hose (this is a once only commissioning test).
8.  Ensure the ‘water flow’ LED is illuminated on the key-switch (make sure the key-switch’s 

power supply is on) this could take up to 30 seconds.

9.  Now close the test/drain valve as appropriate.
10.  Now turn the Zonecheck key-switch to ‘self test’ and check the ‘pump’ and ‘water flow’ 

LEDs are illuminated (this may have a maximum delay of 30 seconds).

11.  Confirm with the centre control room that they have received their test signal.
12.  Turn the key-switch key to ‘standby’ and remove key.
13.  Fix operating instructions to wall, preferably next to the key-switch. Also place the 

Zonecheck Isolation valve location sticker in a suitable position to let others know 
where the unit is.

14.  Ensure that the end user is instructed on how to carry out a routine test. 
15.  Fill in & hand over a completion certificate. Make sure that building management are 

made aware when the system is back online.

Test/drain valve

Access plug

Inlet valve

Vent valve

Fig 1

Fig 2

Outlet valve

Содержание 450

Страница 1: ...ZC450 IB 09 13 01 US InstructionBooklet Zonecheck450...

Страница 2: ......

Страница 3: ...made to ensure that the information contained within this document is correct Project Fire makes no guarantee for completeness or accuracy Project Fire Products Ltd reserves the right to change produ...

Страница 4: ......

Страница 5: ...s 01 Pre checks 02 Installation 03 Commissioning 04 Testing 05 Orientation 06 Typical connection 07 Key switch 08 Wiring 09 Dimensions 10 Specification 11 Troubleshooting 12 Important information 13 W...

Страница 6: ...correct size manifold 3 Check that you have the correct model for your site right or left handed 4 Check that there is a key switch and key in the box 5 Inspect the product to make sure it hasn t been...

Страница 7: ...heck that the sprinkler flow arrows on Zonecheck are facing the correct direction see diagrams included in this booklet 6 Fit the key switch to the wall in a suitable location that is easy to reach fr...

Страница 8: ...7 Discharge water through the hose this is a once only commissioning test 8 Ensure the water flow LED is illuminated on the key switch make sure the key switch s power supply is on this could take up...

Страница 9: ...ks 1 To test all the Zonechecks in the group insert the key into the key switch and turn to group test see fig 1 2 Look at the central fire control panel to confirm simultaneous activation of all the...

Страница 10: ...r The pump direction of flow arrow faces the opposite direction to the system flow The red green stripes on the pump cartridge are always horizontal Do not position the flow switch on the underside of...

Страница 11: ...06 Typical connection Atypicalmulti occupancyZonecheckInstallation Foranexampleofatypicalriserinstallationvisitourwebsite www projectfire co uk View from above Zone Valve...

Страница 12: ...e key switch within 5m commissioning cable length of the Zonecheck Single Occupier Only A single occupier when the Zonecheck units are wired in parallel via interconnect can test all of the units by t...

Страница 13: ...e occupier One fire alarm panel for all Zonechecks installed Multi occupier individual fire alarm panel for each tenant occupier Pump AC AC GND Interconnect WF input B Com B Com Pump L N L N Fire alar...

Страница 14: ...09 Dimensions...

Страница 15: ...v 60Hz 1 63A 185 W maximum IP44 12 bar 175 psi 5 0 F 400 VDB Key switch Mounting Type Operating Voltage Internat Consumption Operation Modes LED Operation Standby Ready state Test Initiation Flow Swit...

Страница 16: ...aintained 7 Open the red valve and the green valve on Zonecheck Only pump light on Pump runs hot and does not operate the flow switch No lights on key switch Open the key switch and check the wiring a...

Страница 17: ...Please ensure the commissioning engineer is aware of the closed Zonecheck valve status Always use a flat faced wrench for Zonecheck commissioning The suggested location for the key switch is at low l...

Страница 18: ...workmanship under normal use and service during the three year period commencing with the date of manufacture After phoning Project Fire s number 01889 271271 for a Return Authorization number send d...

Страница 19: ......

Страница 20: ...ph 763 391 0990 fx 763 391 7668 cel 612 991 9791 8730 Jefferson Highway Osseo Minnesota 55369 USA www gviflow com GLOBAL VISION INC...

Отзывы: