
E Series Operator’s Guide
11-2
9650-1210-01
Rev.
T
Testing the Defibrillator (Semiautomatic Mode)
Perform these tests on all AED units periodically.
Power-Up Sequence Test
Follow these steps to verify the unit’s power-up
sequence.
1. Turn the selector switch on the front panel to the ON
position
2. Verify the following:
•
The unit emits a 4-beep tone to indicate the
power-up self test has been successfully
completed.
•
The
CHECK PADS
message is displayed and
announced.
Defibrillator Test
Perform the defibrillator test to verify that the unit
analyzes ECG rhythm and delivers shock treatment
correctly. To perform this test, you need an ECG rhythm
simulator.
1. Ensure that the selector switch on the E Series front
panel is in the OFF position.
2. Connect the patient end of the multifunction cable to
the defibrillator test connector.
3. Turn the selector switch to ON.
4. Press the
ANALYZE
button and verify that the unit
charges to 30 J (30 J READY message).
5. Once unit has charged, verify the
SHOCK
button
illuminates.
6. Press and hold the
SHOCK
button.
7. Verify that the unit briefly displays the
TEST OK
message and prints a stripchart.
This message indicates that the unit delivered energy
within specifications.
Note:
If
TEST FAILED
message appears, contact the
ZOLL Technical Service Department immediately.
8. Connect the multifunction cable to the ZOLL ECG
Simulator, and set the simulator to VF.
9. Verify that within 30 seconds the unit displays and
and announces the
CHECK PATIENT
prompt.
10. Press the
ANALYZE
button on the front panel and
verify the unit charges to 120 J or other preconfigured
level.
11. Once unit has charged, verify that it illuminates the
SHOCK
button and that it displays and announces
the
PRESS SHOCK
prompt.
12. Press and hold the
SHOCK
button and verify unit
discharges.
Note:
If a
LOW BATTERY
message appears during
testing at the beginning of a shift, the battery
currently in use is close to depletion; replace and
charge the battery. The device does not test the
battery for adequate charge to support extended
use of the unit; capacity can only be determined
by testing the battery in a Base Power
Charger 4x4 or SurePower Charger.
Testing the Defibrillator (Manual Mode)
Perform these tests on all standard E Series units
periodically.
Note:
During the Energy Delivery Test, the unit
discharges only when the energy level is set to
30 joules.
Power-Up Sequence Test
Follow these steps to verify the unit’s power-up
sequence. To perform this test, you need an ECG rhythm
simulator.
1. Ensure the selector switch on the E Series front
panel is set to OFF, and connect the ECG monitoring
cable to the simulator.
2. Turn the selector switch to the MONITOR
position.
3. Verify that the:
•
The unit emits a 4-beep tone to indicate the
power-up self test has been successfully
completed.
•
ECG size is x1
•
MONITOR
message displays on the LCD
•
ECG source is PADDLES or PADS
If no ECG cable is connected to the simulator, the
message
ECG LEAD OFF
is displayed and the ECG
display shows a dashed line instead of a solid line.
Delivered Energy and Shock Buttons
Perform this test at the start of each shift.
Paddles Setup:
1. Verify adult paddles are installed and are inserted all
the way into their holders on the side of the E Series
unit.
2. Turn the selector switch to DEFIB.
3. Set the defibrillator energy level to 30 joules.
4. Press the
CHARGE
button on the apex handle and
verify that the unit displays the
DEFIB 30J READY
message.
WARNING
When performing this test using paddles, use your
thumbs to operate the
SHOCK
buttons in order to
avoid an inadvertent shock. No portion of the hand
should be near the paddle plates.
Содержание E Series
Страница 2: ...9650 1210 01 Rev T E Series Operator s Guide...
Страница 9: ...This page intentionally left blank...
Страница 37: ...E Series Operator s Guide This page intentionally left blank...
Страница 47: ...E Series Operator s Guide This page intentionally left blank...
Страница 53: ...E Series Operator s Guide This page intentionally left blank...
Страница 57: ...E Series Operator s Guide This page intentionally left blank...
Страница 61: ...E Series Operator s Guide This page intentionally left blank...
Страница 67: ...E Series Operator s Guide This page intentionally left blank...
Страница 79: ...E Series Operator s Guide This page intentionally left blank...
Страница 99: ...E Series Operator s Guide This page intentionally left blank...
Страница 127: ...E Series Operator s Guide This page intentionally left blank...