Zoeller WD Скачать руководство пользователя страница 3

3

© Copyright 2011 Zoeller Co. All rights reserved.

On some installations it may be desirable 

to install an independent hanger for the 

level control switches to avoid possible 

hang ups on the pumps, piping, valves, 

etc.  Float hangers are available from 

Zoeller  Company  on  Catalog  Sheet 

FM0526 or can be fabricated from stan-

dard pipe and fittings.

SUGGESTED METHODS OF FLOAT INSTALLATION

TYPICAL FLOAT HANGER ON CONCRETE PITS

OR SEPTIC TANK RISERS

TYPICAL FLOAT HANGER ON STEEL COVER PITS

ACCESS COVER

STANDARD PIPE

FLANGE

PVC OR LIGHT WEIGHT

STAINLESS STEEL PIPE

PEAGRAVEL

TYPICAL FLOAT HANGER ON CONCRETE PITS

OR SEPTIC TANK RISERS

10-1457 FLOAT TREE

WITH 3 FLOATS SHOWN

SK1217

SK1218

RECOMMENDED INSTALLATION FOR ALL APPLICATIONS

All installations must comply with all applicable electrical and plumbing codes, including,  but not limited to, National Electrical Code, local, regional, and/or state plumbing 

codes, etc. Not intended for use in hazardous locations.

  (1)   Electrical wiring and protection must be in accordance with National 

Electrical Code and any other applicable state and local electrical 

requirements. 

  (2)   Install proper Zoeller unicheck (combination union and check valve), 

preferably just above the basin to allow easy removal of the pump for 

cleaning or repair.  On sewage, effluent or dewatering, if high head or 

below cover installation is required use 30-0164 on 1½" pipe, 30-0152 

on 2" pipe and 30-0160 on 3" pipe.  See (4) below. 

  (3)   All installations require a basin cover to prevent debris from falling into 

the basin and to prevent accidental injury. 

  (4)   When a Unicheck is installed, drill a 3/16" dia. hole in the discharge 

pipe even with the top of the pump. 

NOTE: THE HOLE MUST ALSO 

BE BELOW THE BASIN COVER AND CLEANED PERIODICALLY. 

(High Head unit see #3 under “Caution” on front page). Water stream 

will be visible from this hole during pump run periods.

  (5)   Securely tape or clamp power cord to discharge pipe, clear of the float 

mechanism(s). 

  (6)  Use full-size discharge pipe. 

  (7)   Basin must be in accordance with applicable codes and 

 

specifications.

  (8)   Pump must be level and float mechanism(s) clear of sides of basin 

before starting pump.     

  (9)  Basin must be clean and free of debris after installation.

 (10)   Gate Valve or Ball Valve to be supplied by installer and installed 

 

according to any and all codes.

  (11)   Locate float switches as shown in sketches. The best place for the 

“off” point is above the motor housing and positioned 180° from the 

inlet. Never put “off” point below discharge on pump (Sewage & 

 

Effluent only). 

NOTE: FOR AUTOMATIC PUMPS, USE 

DEWATERING INSTALLATION SKETCH.

 (12)  Gas tight seals required to contain gases and odors.

 (13)     Vent gases and odors to the atmosphere through vent pipe (Sewage 

& Dewatering only).

 (14)    Install Zoeller Pump Stand (Model 10-2421) under pump to provide a  

  settling basin. (Effluent & Dewatering only.)

For Effluent Only:

 (15)     Wire pump to power through a Zoeller watertight junction box or 

watertight splice.  

NOTE: Watertight enclosure is a must in damp 

areas. See No. 8 on front page of FM0732.

                  

 (16)   Refer to SSPMA Effluent Sizing Manual for determining “on” - “off” 

switches. 

 (17)    Septic tank risers must be used for easy pump and filter access.

NOTE:

 

Double seal pumps offer extra protection from damage caused by 

seal failure.

TYPICAL SEWAGE INSTALLATION

SK290

Always refer to 

FM0551 and/or 

SSPMA recom-

mended sewage 

pump installation 

and maintenance.

TYPICAL EFFLUENT INSTALLATION

SK291

WW1 
EFFLUENT
FILTER

See FM0531, 

FM0732 & FM1420 

for alarms, controls 

& junction boxes

TYPICAL DEWATERING INSTALLATION

SK292

See FM0531, FM0732 & FM1420 for alarms, 

controls & junction boxes

Содержание WD

Страница 1: ...nduit directly to the pump 8 Installation and servicing of electrical circuits and hardware should be performed by a qualified licensed electrician 9 Pump installation and servicing should be performed by a qualified person 10 Risk of electric shock These pumps have not been investigated for use in swimming pool and marine areas 11 According to the state of California Prop 65 this product contains...

Страница 2: ...not attempt to service or otherwise disassemble pump Service must be performed by Zoeller Authorized Service Stations Go to www zoellerpumps com servicestations to find the Authorized Service Station in your area SERVICE CHECKLIST EASY DO S DON T S FOR INSTALLING A SUMP PUMP 1 DO read thoroughly all installation material provided with the pump 2 DO inspect pump for any visible damage caused by shi...

Страница 3: ...SO BE BELOW THE BASIN COVER AND CLEANED PERIODICALLY High Head unit see 3 under Caution on front page Water stream will be visible from this hole during pump run periods 5 Securely tape or clamp power cord to discharge pipe clear of the float mechanism s 6 Use full size discharge pipe 7 Basin must be in accordance with applicable codes and specifications 8 Pump must be level and float mechanism s ...

Страница 4: ...rrect switching of any two power leads other than ground should provide the proper rotation All three phase pumps require motor starting devices with motor overloadprotection SeeFM0486forduplexinstallations Pumps mustbe installed in accordance withtheNationalElectrical Code and all applicable local codes and ordinances Pumps are not to be installed in locations classified as hazardous in accordanc...

Отзывы: