Li� the switch housing and pump out of the tank.
The discharge elbow pipe can be disconnected from the volute of the pump to be cleared of debris.
© Copyright 2022 Zoeller Co. All rights reserved.
®
- 12 -
*These drawings are for reference only.
Exact components may differ by region.
*These drawings are for reference only.
Exact components may differ by region.
Содержание QWIK JON PREMIER 201
Страница 6: ...STEP 3 ROUGH IN Copyright 2022 Zoeller Co All rights reserved 6...
Страница 8: ...Copyright 2022 Zoeller Co All rights reserved 8...
Страница 9: ...POWER STEP 5 Copyright 2022 Zoeller Co All rights reserved 9...
Страница 15: ...1 2 3 4 5 3mm 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 9 2022 Zoeller 2...
Страница 17: ...15 30 E A B C D 2 5 QWIK JON CHOICE 2022 Zoeller 4...
Страница 19: ...3 2 3mm 3mm 13mm 1 2 3 4 10 3050 13mm 89mm 3 1 2 PVC Schedule 40 3 1 2 3 4 2022 Zoeller 6...
Страница 21: ...Qwik Jon Premier 1 3 4 44 Qwik Jon Premier 2022 Zoeller 8...
Страница 22: ...Qwik Jon Premier 5 2022 Zoeller 9...
Страница 23: ...6 2022 Zoeller 10...
Страница 24: ...Qwik Jon Premier 2022 Zoeller 11...
Страница 25: ...2022 Zoeller 12...