background image

P/N 012224

1.  To reduce the risk of electrical shock, a properly grounded 

receptacle of grounding type must be installed and protected 

by a ground fault circuit interrupter (GFCI) and in accordance 

with national electrical code and local codes.

2.    Make certain that the receptacle is within the reach of the pump’s 

power supply cord. DO NOT USE AN EXTENSION CORD.  

Extension cords that are too long or too light do not deliver 

sufficient voltage to the pump motor. But more important, they 

could present a safety hazard if the insulation were to become 

damaged or the connection end were to fall into the sump.

3.  Testing for Ground. As a safety measure, each electrical outlet 

should be checked for ground using an Underwriters Laboratory 

Listed circuit analyzer which will indicate if the power, neutral 

and ground wires are correctly connected to your outlet. If they 

are not, call a qualified electrician.

4.  For electrical safety, it is recommended that a GFCI be in-

stalled.

5. 

FOR YOUR PROTECTION, ALWAYS DISCONNECT PUMP 

FROM ITS POWER SOURCE BEFORE HANDLING. 

Single 

phase pumps are supplied with a 3-prong grounded plug to help 

protect you against the possibility of electrical shock. 

DO NOT, 

UNDER ANY CIRCUMSTANCES, REMOVE THE GROUND 

PIN

. To reduce the risk of electrical shock, a properly grounded 

receptacle of grounding type  must be installed and protected 

by a ground fault circuit interrupter (GFCI) in accordance with 

national electrical code and local codes.

6.  Installation and checking of electrical circuits and hardware 

should only be performed by a qualified licensed electrician.

7.  Risk of electric shock - These pumps have not been investigated 

for use in swimming pool and marine areas.

8.  According to the state of California (Prop 65), this product 

contains chemicals known to the state of California to cause 

cancer and birth defects or other reproductive harm.

Notice to iNstaller:  instructions must remain with installation.

sectioN: 6.10.060

FM1648

1109

Supersedes

0107

MODELS 108 and 138

CRAWL SPACE  PUMPING SYSTEM

PREINSTALLATION CHECKLIST

® 

Zoeller Pump Company is one of the oldest and largest pump manufacturers in the U.S. and has a history of supplying innovative 

products and services to its customers.

Through research and development, design, testing and manufacturing, we have been able to bring products to the market that solve 

problems that plague consumers, industry, and the environment. This commitment to our customers has enabled them to enjoy returns 

of our joint efforts.

1.  Inspect your unit. Occasionally, products are damaged during shipment. If the unit is damaged, contact  your dealer before using. 

DO NOT

 remove the test plugs in the cover nor the motor housing.

 

2.  Carefully read the literature provided to familiarize yourself with specific details regarding installation and use. These materials should 

be retained for future reference. 

1.  Check to be sure your power source is adequate for handling 

the voltage requirements of the motor, as indicated on the pump 

or basin plate.

2.  Make sure the pump electrical supply circuit is equipped with 

fuses or circuit breakers of proper capacity. A separate branch 

circuit is recommended, sized according to the National Electri-

cal Code for the current shown on the pump name plate.

3.

 

Pump should be checked frequently for debris and/or build up 

which may interfere with the float “on” or “off” position. Repair 

and service should be performed by a Zoeller Pump Company 

Authorized Service Station only.

4.  A CHECK VALVE MAY BE REQUIRED TO REDUCE UNNEC-

ESSARY CYCLING OF PUMP. 

5.  Dewatering pumps are not designed or intended for handling 

raw sewage.

6.  Maximum operating temperature for Crawl Space Drain Pumps 

must not exceed 130°F  (54°C).

SEE BELOW FOR LIST OF WARNINGS

SEE BELOW FOR LIST OF CAUTIONS

refer to warraNty page 2.

NOTE:

 Pumps with the “UL” mark and pumps with the “US” mark 

are tested to UL Standard UL778. CSA Certified pumps are 

certified to CSA Standard C22.2 No. 108.

Product information presented 

here reflects conditions at time 

of  publication. Consult factory 

regarding discrepancies or 

inconsistencies.

MAIL TO:

  P.O. BOX 16347 • Louisville, KY  40256-0347

SHIP TO:

  3649 Cane Run Road  • Louisville, KY  40211-1961

(502) 778-2731 • 1 (800) 928-PUMP • FAX (502) 774-3624

visit our web site:

www.zoeller.com

®

Your Peace of Mind is Our Top Priority

 

®

Содержание CRAWL SPACE 108

Страница 1: ... Pump Company is one of the oldest and largest pump manufacturers in the U S and has a history of supplying innovative products and services to its customers Through research and development design testing and manufacturing we have been able to bring products to the market that solve problems that plague consumers industry and the environment This commitment to our customers has enabled them to en...

Страница 2: ...r warranty MANUFACTURER EXPRESSLY DISCLAIMS LIABILITY FOR SPECIAL CONSEQUENTIAL OR INCIDENTAL DAMAGES OR BREACH OF EX PRESSED OR IMPLIED WARRANTY AND ANY IMPLIED WARRANTY OF FITNESS FOR A PARTICULAR PURPOSE AND OF MERCHANT ABILITY SHALL BE LIMITED TO THE DURATION OF THE EXPRESSED WARRANTY Some states do not allow limitations on the duration of an implied warranty so the above limitation may not ap...

Страница 3: ...S 10 20 30 40 50 60 70 80 5 10 15 20 25 0 0 80 160 240 2 4 6 GALLONS LITERS FLOW PER MINUTE METERS FEET TOTAL DYNAMIC HEAD PUMP PERFORMANCE CURVE MODEL 98 009971 Model 108 Model 138 98 95 170 231 273 Liters 23 ft 7 0m Shut off Head 20 7 1 25 Meters 15 10 Feet 5 4 6 3 0 1 5 MODEL 61 72 Gal 45 19 25 ft 5 9m 53 Shut off Head MODEL 15 10 Feet 5 4 6 3 0 34 19 1 5 Meters 43 Gal 72 129 163 Liters 009897 ...

Страница 4: ...he site to the dimension shown in Figure 2 1 Note Ifweeptilesordrainlinesaretobeused rough inplumbing should be completed at this time 2 2 Lower basin into pit Refer to Figure 2 2 Complete instal lation of weep or drain lines STEP 2A Installation of Slotted Basin with Optional Extension Kit 2A 1 Excavate the site to the dimensions shown in Figure 2A 1 Note If weep tiles or drain lines are to be us...

Страница 5: ... WEEP TILES SLOTTED BASIN PRIMARY PUMP EXTENSION 1 1 4 ELECTRICAL ACCESS HOLE SLOTTED BASIN LID 2 FLEXIBLE DISCHARGE LINE HOLE DISCHARGE LINE SLOTTED BASIN DRAIN LINES OR WEEP TILES PRIMARY PUMP 25 CORD Copyright 2009 Zoeller Co All rights reserved STEP 3 Installation of Pump and Cover 3 1 Attach the flexible discharge hose to pump and lower into pit 3 2 Attach lid and complete discharge line conn...

Страница 6: ...5 2 Pour water through lid until pump comes on 5 3 Check all discharge line connections for leaks or obstructions 5 4 If the pump begins to short cycle as described in part C of the troubleshooting guide then it will be necessary to install a check valve in the discharge line This will prevent water from draining from the discharge line back into the pit Refer to Figure 5 1 If a check valveisinsta...

Страница 7: ...mp 1 012319 012320 2 Slotted Basin 1 012172 012172 3 Lid 1 012173 012173 4 Hose Kit 1 1010 0117 1010 0117 REF NO MODELS 108 A DESCRIPTION NOTES 138 A 6 98 to Present 6 98 to Present Accessories Item P N Description QTY 5 1010 0786 Extension Kit and Lid 1 6 10 0770 Weather Tight Junction Box 1 7 10 1494 Alarm 1 QTY sk1824 sk1823 sk1858 8 EXTENSION KIT AND LID WEATHER TIGHT JUNCTION BOX 5 6 ...

Страница 8: ... Authorized Service Station Remove debris as necessary Contact a Zoeller Authorized Service Station Clear weep hole as necessary Clear lines as necessary Refer to pump performance chart on page 3 or contact factory Have qualified electrician check circuit Clear and protect from freezing See STEP 6 Condition Possible Cause Remedy A PUMP WILL NOT START OR RUN B PUMP TRIPS OVERLOAD OR BLOWS FUSE C PU...

Отзывы: