background image

6

© Copyright 2013 Zoeller Co. All rights reserved.

FIGURE 4

SK2502

SK2501

EXPLODED VIEW - DC PUMP

PUMP ASSEMBLY

FIGURE 3

BATTERY BOX

12 VOLT

MARINE BATTERY

SUPPLIED BY USER

DC BACK-UP PUMP

CLAMP

FLOAT SWITCH

WHITE LEAD

   TO POSITIVE

BLACK LEAD

TO POSITIVE

WHITE LEAD

TO DC PUMP

BLACK LEAD

TO NEGATIVE

TO FLOAT

RED LEAD

15 AMP FUSE

DC CHARGER

BLACK LEAD

TO NEGATIVE

TO FLOAT SWITCH

GREEN LEAD

SPLICER

WHITE OR

TOP VIEW

IMPORTANT:

MAKE SURE THIS LINE IS

GLUED IN POINTING UP.

1

11

6

(SUPPLIED BY CUSTOMER)

DISCHARGE PIPE

Содержание Basement Sentry 507

Страница 1: ...e state of California to cause cancer and birth defects or other reproductive harm 1 Make sure there is a properly grounded 115V receptacle available Do not use primary pump circuit The location must be within 6 of the control box and battery The power supply for your DC control system plugs directly into the 115V outlet Do not use an extension cord 2 Make sure the 115V electrical supply circuit i...

Страница 2: ...imited warranty valid only when a complete system is purchased and used as a backup to a primary dewatering system A complete system includes a Model 507 Basement Sentry and an Aquanot Battery 1 Inspectandtestthesystemforproperoperationsatleastevery3months a Red power on indicator light should be on indicating AC power is on b Unplug primary pump and the control charger from power supply c Fill su...

Страница 3: ...he DC emergency pump is designed as a backup to your primary sump pump during unexpected power outages or primary pump failure The DC pump electronic controls and all the parts required for installation are included except the battery which is supplied by the user The system is designed for installation in sumps with minimum of 18 diameter and 24 deep For 18 x 22 applications consult factory DESCR...

Страница 4: ...ark the discharge pipe 7 above the top of the primary pump and cut the discharge at that location b If the primary pump is a column pump with adjustable on position and you are installing per Figure 2 check the on point and adjust to approximately 7 1 2 from the bottom of the primary pump Mark the discharge pipe 7 above the on position of the primary column pump and cut the discharge pipe at that ...

Страница 5: ...ump must be mounted on a 30º angle to avoid airlocking OUTLET PUMP PRIMARY 1 MIN IMPORTANT OFF LEVEL OF FLOAT ASSEMBLY MUST BE HIGHER THAN DC BACKUP PUMP VERIFY WEEP HOLE IS PRESENT IN MAIN DISCHARGE LINE SEE PUMP INSTALLATION INSTRUCTIONS BATTERY BOX TM R FIG 2 BATTERY BOX OUTLET PRIMARY PUMP IMPORTANT OFF LEVEL OF FLOAT ASSEMBLY MUST BE HIGHER THAN DC BACKUP PUMP 1 MIN TM R SK2499 SK2500 ...

Страница 6: ...PPLIED BY USER DC BACK UP PUMP CLAMP FLOAT SWITCH WHITE LEAD TO POSITIVE BLACK LEAD TO POSITIVE WHITE LEAD TO DC PUMP BLACK LEAD TO NEGATIVE TO FLOAT RED LEAD 15 AMP FUSE DC CHARGER BLACK LEAD TO NEGATIVE TO FLOAT SWITCH GREEN LEAD SPLICER WHITE OR TOP VIEW IMPORTANT MAKE SURE THIS LINE IS GLUED IN POINTING UP 1 11 6 SUPPLIED BY CUSTOMER DISCHARGE PIPE ...

Страница 7: ...e battery voltage and current going to the battery if charging The alarm screen shows current alarms The cycle counter screen shows how many times the DC float has been activated The AC power loss counter screen shows how many times the AC power has been removed from the charger Optional a screen may also show the name and number of a service provider The 6 LED lights also display information abou...

Страница 8: ...g the CO detector to activate Contact the manufacturer and ask for recommendations as to what can be done to prevent the alarm activation MAIL TO P O BOX 16347 Louisville KY 40256 0347 SHIP TO 3649 Cane Run Road Louisville KY 40211 1961 502 778 2731 1 800 928 PUMP FAX 502 774 3624 Your Peace of Mind is Our Top Priority visit our web site www zoeller com There are millions of batteries manufactured...

Отзывы: