background image

5

© Copyright 2020 Zoeller

®

 Co. All rights reserved.

MIN. "OFF" LEVEL

22" MAX.

5" MIN.

20 AMP SWITCH (WD & WH MODELS)

 

FOR YOUR PROTECTION, ALWAYS DISCONNECT THE PUMP FROM ITS POWER SOURCE BEFORE HANDLING

. Single phase 

automatic pumps are supplied with a 3-prong grounded plug to help protect you against the possibility of electrical shock.  

DO NOT UNDER 

ANY CIRCUMSTANCES REMOVE THE GROUND PIN.

  

The 3-prong plug must be inserted into a mating 3-prong grounded receptacle.  If the 

installation does not have such a receptacle, it must be  wired and grounded in accordance with the National Electrical Code and all applicable 

local codes and ordinances.  

 

“Risk of electrical shock”  

Do not remove the power supply cord and strain relief or connect conduit directly to pump.

Pump Wiring Instructions

Installation and checking of electrical circuits and hardware should be performed by a qualified licensed electrician.

FIGURE 4.

FIGURE 5.

Models WD & WH are fully automatic. A float switch is included and factory wired in the pump circuit to provide automatic operation once the float switch is 

secured properly to the outlet pipe. Use the diagram above to secure the float switch properly and obtain the proper tether to customize the on-off cycle to each 

application. Note the minimum off level shown above.  On Prepackaged Systems, the tether length is set at 5”.

Determining Pumping Range

in Inches (1 inch - 2.5 cm)

Tether Length

 

5  10  15 20 22

Pumping Range

 

9  13.5 18 22 24

Use only as a guide. Due to weight of 

cable, 

pumping range above horizontal 

is not equal to pumping range below 

horizontal. Ranges are based on testing in 

nonturbulent conditions.

 Range may vary 

due to water temperature and cord shape. 

As tether length increases, so does the 

variance of the pumping range.

Note:

 Failure to keep within proper tether limits may 

prevent reliable switch operation.

Note:

 Cable must be mounted in horizontal position.

SK2304

min.

max.

SK305D

RUN

O.L.

MOTOR

(3)

BLUE

RED

BLACK

GREEN

L1

L2

START

(1)

(2)

YELLOW

RED

R

RELAY

(WHITE)

(BLACK)

YELLOW

(BROWN)

BLUE

1

5

2

WHITE

CAPACITOR

START

WHITE

BLACK

BLACK

CAPACITOR

RUN

RUN

O.L.

MOTOR

(3)

BLUE

RED

FLOAT 

BLACK

GREEN

L1

L2

START

(1)

(2)

YELLOW

RED

R

RELAY

(WHITE)

(BLACK)

YELLOW

CAPACITOR

(BROWN)

BLUE

WHITE

1

5

2

BLACK

WHITE

CAPACITOR

START

RUN

BLACK

WHITE

BLACK

010415

     AUTOMATIC

WIRING DIAGRAM

010443

 NONAUTOMATIC

WIRING DIAGRAM

1 PH

MOTOR

(3)

BLUE

RED

BLACK

GREEN

L1

L2

(1)

(2)

YELLOW

L3

WHITE

RED

 NONAUTOMATIC

WIRING DIAGRAM

3 PH

006848

Содержание 818-0002

Страница 1: ...able of Contents Safety Instructions 1 Limited Warranty 2 Preinstallation Checklist 3 General Information 4 Pump Wiring Instructions 5 Typical Indoor Prepackaged System 6 Indoor Prepackaged Installation Instructions 7 Typical Outdoor Prepackaged System 8 Outdoor Prepackaged Installation Instructions 9 Operation 10 Cutter Maintenance 11 Service Checklist 12 Safety Instructions TOAVOIDSERIOUSORFATAL...

Страница 2: ...re mechanism or the complete unit No allowance will be made for shipping charges damages labor or other charges that may occur due to product failure repair or replacement This warranty does not apply to and there shall be no warranty for any material or product that has been disassembled without prior approval of Manufacturer subjected to misuse misapplication neglect alteration accident or act o...

Страница 3: ...liarities and are secured so that the grinder pump will shut off It is recommended to use rigid pipe and fittings and the pit be 24 in diameter for simplex systems and 36 in diameter for duplex systems or larger 4 Grinderinstallationsshouldbecheckedyearlyfordebrisand orbuildupwhich may interfere with the ON or OFF positions of variable level float control switches Repairandservice otherthancuttera...

Страница 4: ...st comply with the National Electrical Code and applicable local codes Conduit and panel enclosure openings must have a gas and watertight seal Installation of electrical panels conduit and connections should be made by a qualified licensed electrician A UL Listed potting kit P N 10 2350 is available from Zoeller Company 4 When installing a pump with a check valve or a rail system with a check val...

Страница 5: ... diagram above to secure the float switch properly and obtain the proper tether to customize the on off cycle to each application Note the minimum off level shown above On Prepackaged Systems the tether length is set at 5 Determining Pumping Range in Inches 1 inch 2 5 cm Tether Length 5 10 15 20 22 Pumping Range 9 13 5 18 22 24 Use only as a guide Due to weight of cable pumping range above horizon...

Страница 6: ...4 STEEL CORD SEAL INSPECTION PLATE 3 GROMMET SEAL SWITCH CORD ALARM FLOAT BASIN COVER LIFTING BOLT 16 X 1 4 STEEL 5 16 304 STAINLESS STEEL PUMP PLATE PUMP POWER CORD SILENCE INPUT 1 POWER ON FIELD INSTALLED ALARM 4 RUBBER INLET CAST IRON ADAPTERS OFF 24 NOMINAL TO ALARM PANEL BALL VALVE FIELD INSTALLED GALVANIZED PIPE 1 1 4 X 32 GALVANIZED PIPE 1 1 4 X 12 GRINDER PUMP SINGLE PHASE 2HP 1 1 4 GROMME...

Страница 7: ...d be located in a very low traffic area within 15 of the power disconnect The hole should be at least 8 larger in diameter than the basin in order to leave 4 of backfill all the way around the perimeter A minimum of 4 of compacted subbase is also required Backfill and subbase should be 1 8 to 3 4 pea gravel or 1 8 to 1 2 crushed stone Also reference the basin installation instructions included wit...

Страница 8: ...GLASS AFD 1 25 2 Z RAIL 2 CAST IRON CHECK VALVE 3 4 GUIDE RAILS 2 SCH 80 BALL VALVE 2 FLEX BOOT FITTING LOCATION VARIES WITH BASIN DEPTH FLOAT TREE ASSEMBLY 2HP GRINDER PUMP 2 PVC SCH 80 PLBG 1 8 302 STAINLESS STEEL LIFTING CABLE ALARM ON OFF SOLID FIBERGLASS COVER HIGH WATER ALARM OR SIMPLEX CONTROL PANEL FIELD INSTALLED ALARM FLOAT SWITCH MUST OPERATE OFF LOW VOLTAGE TO BE USED WITH QWIK BOX SK3...

Страница 9: ... inner diameter with the hole in the basin Attach the hub to the side of the basin using the sealant and hardware provided 6 The bottom of the excavation can now be properly backfilled compacted and leveled Set basin in hole Ensure the removable cover extends above the finished grade line and the grade slopes awayfromtheunit Backfillandsubbaseshouldbe1 8 3 4 pea gravel or 1 8 1 2 crushed stone Ref...

Страница 10: ...rely installed Floats positioned properly Discharge valves open 3 16 vent hole drilled in pipe between check valve and pump Once the above has been verified proceed with the following checks Pump power cables and control floats properly installed and voltage verified Conduit connections to panel and junction box are properly sealed After installing the pump into the containment area with adequate ...

Страница 11: ...ing both disc and cutter to a 32 micro finish Do not attempt grinding in the field Send parts to a qualified machine shop or return to the factory for repair The disc cutter and shims are a matched set Keep parts together Measure disc before and after resurfacing with micrometer and record measurements 7 After resurfacing the disc and cutter must be flat within 0 001 If the disc has been surface g...

Страница 12: ...ways disconnect pump and panel from its power source before handling Never enter the basin until it has been properly ventedandtested Anypersonenteringabasinshouldbewearing aharnesswithsafetyropeextendingtothesurfacesothattheycan be pulled out in case of asphyxiation Sewage water gives off methane and hydrogen sulfide gases both of which can be highly poisonous Installation and checking of electri...

Отзывы: