background image

6

T3 

T2 

T1 

L3 

L2 

L1 

POWER CABLE 

(N/C) 

THERMAL SENSOR 

330K OHMS RESISTANCE

SEAL FAILURE PROBES

3 PHASE MOTOR 

PANEL. 

INDUCTION CIRCUIT IN THE CONTROL 

LEADS MUST BE CONNECTED TO  

SEAL FAILURE MOISTURE SENSOR 

STARTER COIL 

CONNECTED IN SERIES WITH 

RECOMMENDED THERMAL SENSOR 

3ø VAC 

SENSOR CABLE 

BLACK 

WHITE 

ORANGE 

RED 

GREEN 

230 VAC 1ø

FROM CONTACTOR

RELAY

START

1

2

5

BLACK

CAPACITORS

START

RUN CAPACITOR

WHITE

BLACK

RED

WHITE

MAIN

PUMP

START

4

5

1

L1

L2

C-1

C-2

C-3

GREEN

© Copyright 2015 Zoeller

®

 Co. All rights reserved.

Three Phase Installation

Three phase pumps are nonautomatic. To operate automatically, a control panel 

is required. Follow the instructions provided with the panel to wire the system.

Before installing a pump, check the pump rotation to insure that wiring has been 

connected properly to power source, and that the green lead of power cord (See 

wiring diagram), is connected to a valid ground, Momentarily energize the pump, 

observing the directions of kick back due to starting torque. Rotation is correct 

if kick back is in the opposite direction of rotation arrow on the pump casing. 

If rotation is not correct, switching of any two power leads other than ground, 

should provide the proper rotation.

The above wiring diagram shows a typical hookup for a 230 volt, 3 phase pump, 

two variable level float switches, and a magnetic starter.  It is not intended that 

this diagram cover all applications.  See wiring diagram supplied with specific 

electrical controllers and panels.

NOTE 1: Optional sensor cable includes 5 leads; 2 leads for thermal sensor, 2 

leads for moisture sensor, and a green ground lead. If one sensor only is specified, 

both sensors are provided and must be hooked up to validate warranty. The 

sensors must be specified at time of initial pump order and are not available 

for field installation. Sensor wire colors are as shown.

TYPICAL 3-PHASE  WIRING DIAGRAM

Refer to Sensor and Control Panel sections on page 5.

ZEPA0036

ZEPA0038E

Single Phase Installation

All single phase models require start capacitor, run capacitor and relay in the circuit to start and operate properly. These components can be purchased separately 

or prewired in Zoeller control panel. For components purchased separately used the diagram for installation and hookup.

Single phase models are nonautomatic. To operate automatically a control panel  must be added to the power circuit. Follow the instructions provided with the panel.

ZEPA0041

ZEPA0040

WIRING DIAGRAM

1

2

5

L2

T2

T1

L1

RELAY

START

MOTOR

BLACK

START CAPACITORS

WHITE

230 VAC 1Ø

RUN CAPACITOR

4

WHITE

RED

BLACK

PUMP

START

5

MAIN

1

C-1

C-2

C-3

GREEN

(460-552MF, 125 VOLTS)

(30MF, 440 VOLTS)

COMPONENT LAYOUT

WIRING DIAGRAM 

ZEPA0043

COMPONENT LAYOUT

ZEPA0042

 5 BHP MODEL 6220

7½ BHP MODEL 6221

C-4

MAIN

START

PUMP

RED

BLACK

C-3

RUN CAPACITORS

C-1

C-2

START

CAPACITORS

BLACK

5

2

1

5 1

4

START

RELAY

FROM CONTACTOR

230 VAC 1ø

WHITE

L1

L2

WHITE

GREEN

WHITE

START CAPACITORS

RUN CAPACITORS

RELAY

START

C-1

C-2

C-4

C-3

4

230 VAC 1Ø

BLACK

RED

WHITE

PUMP

MAIN

START

BLACK

L1

T1

T2

L2

1

5

2

5

1

GREEN

(20MF, 370 VOLTS)

(590-708MF, 110-125 VOLTS)

OL

OL

OL

STARTER

MAGNETIC

IS REQUIRED

CIRCUIT TRANSFORMER

3 PHASE A CONTROL

NOTE - FOR 460 VOLT

FLOAT SWITCH

"OFF"

FLOAT SWITCH

"ON"

L3

L2

L1

2

3

MOTOR

PUMP

T3

T2

T1

OL

M

230 VOLTS, 60 HZ., 3 PH

TYPICAL WIRING DIAGRAM

NOTES:

1. “◊” DENOTES A TERMINAL ON    

 

MOTOR START RELAY ASSEMBLY.

2.  “Ο” DENOTES MOTOR TERMINAL. 

3.  MOTOR EQUIPPED WITH MOISTURE  

 

PROBES AND THERMAL SENSORS.  

 

REFER TO 3 PHASE WIRING DIAGRAM  

 BELOW.

NOTES:

1. “◊” DENOTES A TERMINAL ON    

 

MOTOR  START RELAY ASSEMBLY.

2.  “Ο” DENOTES MOTOR TERMINAL. 

3.  MOTOR  EQUIPPED WITH MOISTURE  

 

PROBES AND THERMAL SENSORS.  

 

REFER TO 3 PHASE WIRING DIAGRAM  

 BELOW.

Содержание 62 HD Series

Страница 1: ...y during installation Reference ZM2354 for repair manual on 62HDSeriesPumps Shouldfurtherassistancebenecessaryplease call our Technical Support Department at 1 800 928 PUMP 7867 Table of Contents Safety Instructions 1 Limited Warranty 2 Preinstallation Information 3 Electrical Data 3 Typical Dewatering Installation 4 Typical Sewage Installation 4 Pump Wiring Instructions 5 6 Operation 7 Maintenanc...

Страница 2: ...and you may also have other rights which vary from state to state Zoeller Engineered Products neither assumes nor authorizes any person or company to assume for it any other obligation in connection with the sale of its equipment Any enlargement or modification of this warranty by any other party is their sole responsibility No other warranties expressed or implied including implied warranties of ...

Страница 3: ...st be drilled in the discharge pipe below the check valve and pit cover to purge the unit of trapped air Water stream will be visible from this hole during pump run periods This vent hole should be checkedperiodicallyforcloggingandcleanedasnecessary Trappedairiscaused by agitation and or a dry basin 4 Water hammer creates momentary high pressure surges These surges can cause severe damage to check...

Страница 4: ...st be below the basin cover and cleaned periodically Water stream will be visible from this hole during pump run periods Also a vent hole is drilled in the pump housing Be sure that this hole is cleared during any servicing 7 Vent gases and odors to the atmosphere through vent pipe per Local and State codes 8 Secure power cord to avoid entanglement with variable level float switch mechanism 9 Do n...

Страница 5: ...ture indicator light is activated the lower seal has allowed leakage of water into the lower oil filled seal cavity The pump should be serviced within 30 days to avoid damage to the motor and bearings 4 Oil in the motor housing and lower seal cavity must be checked when pump is serviced If oil from the motor housing contains water or other contamination both seals should be replaced during mainten...

Страница 6: ...t be specified at time of initial pump order and are not available for field installation Sensor wire colors are as shown TYPICAL 3 PHASE WIRING DIAGRAM Refer to Sensor and Control Panel sections on page 5 ZEPA0036 ZEPA0038E Single Phase Installation All single phase models require start capacitor run capacitor and relay in the circuit to start and operate properly These components can be purchase...

Страница 7: ...han six months the following is recommended Pumps If pit is to remain dry then the pump can remain in the pit With the pump in the pit it should be operated for five minutes once every three months If the pit is to remain wet the pump should be removed and stored as noted above Panels The panel should have all openings sealed to prevent moisture and dust from entering the enclosure Prior to restar...

Страница 8: ...verheats and trips overload or blows fuse Incorrect Voltage Unbalanced power source Incorrect motor rotation Negative or low head Excessive water temperature Impeller or seal mechanically bound Capacitor or relay Motor shorted Lost one line in a Three Phase unit C Pumps starts and stops too often Check valve stuck open Level controls out of adjustment Temperature sensor tripping Thermal overload s...

Отзывы: