Zoeller 61 HD Series Скачать руководство пользователя страница 6

6

© Copyright 2021 Zoeller

®

 Co. All rights reserved.

5

4

1

6

2

WHITE

RED

PUMP

MAIN

START

L1

L2

BLACK

WHITE

230 VAC 1ø

FROM CONTACTOR

RUN

START

BLACK

START

RELAY

CAPACITOR

CAPACITOR

1

2 3

GREEN

2

4

1

6

5

WHITE

PUMP

START

MAIN

BLACK

L2

WHITE

BLACK

RUN CAPACITOR

RED

START CAPACITOR

L1

T2

T1

START

RELAY

3

2

1

GREEN

230 VAC 1ø

(SEE CHART)

(SEE CHART)

START CAP.

324-389UF 125V

MODELS

6120/6121

RUN CAP.

40UF 370V

A

Three Phase Installation

Three phase pumps are nonautomatic. To operate 

automatically, a control panel is required. Follow the 

instructions provided with the panel to wire the system.

Before installing a pump, check the pump rotation 

to insure that wiring has been connected properly 

to power source, and that the green lead of power 

cord (See wiring diagram), is connected to a valid 

ground, Momentarily energize the pump, observing the 

directions of kick back due to starting torque. Rotation 

is correct if kick back is in the opposite direction of 

rotation arrow on the pump casing. If rotation is not 

correct, switching of any two power leads other than 

ground, should provide the proper rotation.

Refer to the wiring diagram supplied with specific 

electrical control panel for correct cable termina-

tion locations.

Refer to Sensor and Control Panel sections on page 4.

NOTE 1:

 Optional sensor cable includes 5 leads; 2 leads for thermal sensor, 2 leads for moisture sensor, and a green ground lead. If one sensor only is specified, 

both sensors are provided and must be hooked up to validate warranty. The sensors must be specified at time of initial pump order and are not available for field 

installation. Sensor wire colors are as shown.

(N/C)

SENSOR

330K OHMS RESISTANCE

SEAL FAILURE PROBES

PANEL.

INDUCTION CIRCUIT IN THE CONTROL

LEADS MUST BE CONNECTED TO 

SEAL FAILURE MOISTURE SENSOR

STARTER COIL

CONNECTED IN SERIES WITH

RECOMMENDED THERMAL SENSOR

THERMAL

T3

T2

T1

L3

L2

L1

POWER CABLE

3 PHASE MOTOR

3Ø VAC

SENSOR CABLE

BLACK

WHITE

ORANGE

RED

GREEN

TYPICAL 3-PHASE  WIRING DIAGRAM

ZEPA0038E

Single Phase Installation

All single phase models require start capacitor, run capacitor and relay in the circuit to start and operate properly. These components can be purchased separately 

or prewired in Zoeller control panel. For components purchased separately used the diagram for installation and hookup.

Single phase models are nonautomatic. To operate automatically a control panel  must be added to the power circuit. Follow the instructions provided with the panel.

ZEPA0478

ZEPA0477

WIRING DIAGRAM

COMPONENT LAYOUT

WIRING DIAGRAM 

ZEPA0538

COMPONENT LAYOUT

ZEPA0537A

 MODELS 6120 / 6121

USING SUPCO PR90

RELAY BEFORE 

10/1/07

MODELS

 6111 / 6122 / 6123 / 6124

AND 6120 / 6121 USING 

GE RELAY AFTER 10/1/07

5

2

1

WHITE

RED

PUMP

MAIN

START

L1

L2

BLACK

WHITE

230 VAC 1Ø

FROM CONTACTOR

START

BLACK

START

RELAY

CAPACITOR

RUN CAPACITOR

1

2

3

GREEN

2

1

5

WHITE

PUMP

START

MAIN

BLACK

L2

WHITE

BLACK

RUN CAPACITOR

RED

START CAPACITOR

L1

T2

T1

3

2

1

GREEN

230 VAC 1Ø

(SEE CHART)

(SEE CHART)

R

RELAY

START

START CAP.

MODELS

RUN CAP.

6120/6121

216-259UF 250V

40UF 370V

6111/6122/6123/6124

270-324UF 250V

50UF 370V

Содержание 61 HD Series

Страница 1: ...60 for repair manual on 61 HD Series Pumps Should further assistance be necessary please call our Technical Service Department at 1 800 928 PUMP 7867 Table of Contents Safety Instructions 1 Limited Wa...

Страница 2: ...manufactured at Zoeller Engineered Product s option provided however that by so doing we shall not be obligated to replace an entire assembly the entire mechanism or the complete unit Major components...

Страница 3: ...it be 36 or larger in diameter 3 INFORMATION VENT HOLE PURPOSE It is necessary that all submersible pumpscapableofhandlingvarioussizesofsolidwastebeofthebottomintake design to reduce clogging and seal...

Страница 4: ...t gases and odors to the atmosphere through vent pipe per local and state codes 8 Secure power cord to avoid entanglement with variable level float switch mechanism 9 Do not reduce pump discharge pipe...

Страница 5: ...and white wires The VOM should read approximately 330k Ohms Resistance readings significantly lower indicate a seal leak with water in the seal chamber If VOM reading is open then a problem exists wi...

Страница 6: ...d must be hooked up to validate warranty The sensors must be specified at time of initial pump order and are not available for field installation Sensor wire colors are as shown N C SENSOR 330K OHMS R...

Страница 7: ...a system is shutdown for more than six months the following is recommended Pumps If pit is to remain dry then the pump can remain in the pit With the pump in the pit it should be operated for five min...

Страница 8: ...ll not shut off Debris under float switch Float travel obstructed Defective or damaged float switch Magnetic starter contacts shorted Air lock check vent hole E Pump operates but delivers little or no...

Отзывы: