On some installations it may be desirable 

to install an independent hanger for the 

level control switches to avoid possible 

hang ups on the pumps, piping, valves, 

etc.  Float hangers are available from 

Zoeller  Company  on  Catalog  Sheet 

FM0526 or can be fabricated from stan-

dard pipe and fittings.

SUGGESTED METHODS OF FLOAT INSTALLATION

TYPICAL FLOAT HANGER ON CONCRETE PITS

OR SEPTIC TANK RISERS

TYPICAL FLOAT HANGER ON STEEL COVER PITS

ACCESS COVER

STANDARD PIPE

FLANGE

PVC OR LIGHT WEIGHT

STAINLESS STEEL PIPE

PEA GRAVEL

TYPICAL FLOAT HANGER ON CONCRETE PITS

OR SEPTIC TANK RISERS

10-1457 FLOAT TREE

WITH 3 FLOATS SHOWN

SK1217

SK1218

RECOMMENDED INSTALLATION FOR ALL APPLICATIONS

All installations must comply with all applicable electrical and plumbing codes, including,  but not limited to, National Electrical Code, local, regional, and/or state plumbing 

codes, etc. Not intended for use in hazardous locations.

  (1)   Electrical wiring and protection must be in accordance with National 

Electrical Code and any other applicable state and local electrical 

requirements. 

  (2)   Install proper Zoeller unicheck (combination union and check valve), 

preferably just above the basin to allow easy removal of the pump for 

cleaning or repair.  On sewage, effluent or dewatering, if high head or 

below cover installation is required use 30-0164 on 1½" pipe, 30-0152 

on 2" pipe and 30-0160 on 3" pipe.  See (4) below. 

  (3)   All installations require a basin cover to prevent debris from falling into 

the basin and to prevent accidental injury. 

  (4)   When a Unicheck is installed, drill a 3/16" dia. hole in the discharge 

pipe even with the top of the pump. NOTE: THE HOLE MUST ALSO 

BE BELOW THE BASIN COVER AND CLEANED PERIODICALLY. 

(High Head unit see #3 under “Caution” on front page). Water stream 

will be visible from this hole during pump run periods.

  (5)   Securely tape or clamp power cord to discharge pipe, clear of the float 

mechanism(s). 

  (6)  Use full-size discharge pipe. 

  (7)   Basin must be in accordance with applicable codes and 

 

specifications.

  (8)   Pump must be level and float mechanism(s) clear of sides of basin 

before starting pump.     

  (9)  Basin must be clean and free of debris after installation.

 (10)   Gate Valve or Ball Valve to be supplied by installer and installed 

 

according to any and all codes.

  (11)   Locate float switches as shown in sketches. The best place for the 

“off” point is above the motor housing and positioned 180° from the 

inlet. Never put “off” point below discharge on pump (Sewage & 

 

Effluent only). 

NOTE: FOR AUTOMATIC PUMPS, USE 

DEWATERING INSTALLATION SKETCH.

 (12)  Gas tight seals required to contain gases and odors.

 (13)     Vent gases and odors to the atmosphere through vent pipe (Sewage 

& Dewatering only).

 (14)    Install Zoeller Pump Stand (Model 10-2421) under pump to provide a  

  settling basin. (Effluent & Dewatering only.)

For Effluent Only:

 (15)     Wire pump to power through a Zoeller watertight junction box or 

watertight splice.  

NOTE: Watertight enclosure is a must in damp 

areas. See No. 8 on front page of FM0732.

                  

 (16)   Refer to SSPMA Effluent Sizing Manual for determining “on” - “off” 

switches. 

 (17)    Septic tank risers must be used for easy pump and filter access.

NOTE: Double seal pumps offer extra protection from damage caused by 

seal failure.

TYPICAL SEWAGE INSTALLATION

SK290

100 mm (4”)
OF GRAVEL

Always refer to 

FM0551 and/or 

SSPMA recom-

mended sewage 

pump installation 

and maintenance.

TYPICAL EFFLUENT INSTALLATION

SK291

WW1 
EFFLUENT
FILTER

See FM0531, 

FM0732 & FM1420 

for alarms, controls 

& junction boxes

TYPICAL DEWATERING INSTALLATION

SK292

TURN

ON

TURN

OFF

1

2

3

7

9

14

8

6

4

5

10

12

13

10 cm (4") OF GRAVEL

    MINIMUM
457mm X 610mm
 (18"X24" BASIN.)
 LARGER DEPTHS
    MAY BE 
   REQUIRED.

See FM0531, FM0732 & FM1420 for alarms, 

controls & junction boxes

Содержание 49 Series

Страница 1: ...ified licensed electrician 9 Pump installation and servicing should be performed by a qualified person 10 Risk of electric shock These pumps have not been investigated for use in swimming pool and mar...

Страница 2: ...rvice Stations Go to www zoellerpumps com servicestations to find the Authorized Service Station in your area SERVICE CHECKLIST EASY DO S DON T S FOR INSTALLING A SUMP PUMP 1 DO read thoroughly all in...

Страница 3: ...nder Caution on front page Water stream will be visible from this hole during pump run periods 5 Securely tape or clamp power cord to discharge pipe clear of the float mechanism s 6 Use full size disc...

Страница 4: ...rect switching of any two power leads other than ground should provide the proper rotation All three phase pumps require motor starting devices with motor overloadprotection SeeFM0486forduplexinstalla...

Страница 5: ...iable o las bom bas no autom ticas que usan interruptores de flotador de nivel variable auxiliares es responsabi lidad del instalador y deber verificarse que el interruptor de flotador atado no se eng...

Страница 6: ...umidero 6 INSTALE una v lvula de retenci n y una uni n en la tuber a de descarga JAM S use una tuber a de descarga de menor tama o que la descarga de la bomba 7 JAM S use una bomba de sumidero como un...

Страница 7: ...ATICAS UTILICE EL ESQUEMA PARA LA INSTALACION PARAACHIQUE M S ABAJO 12 Los sellos herm ticos contra gases son necesarios en todas las instalaciones de aguas cloacales a fin de contener los gases y olo...

Страница 8: ...osee un tomacorriente de este tipo se debe cambiar por uno apropiado cableado y con puesta a tierra de acuerdo al C digo El ctrico Nacional y a todas las ordenanzas y c digos locales aplicables ADVERT...

Страница 9: ...roits classifi s risque conform ment la norme ANSI NFPA 70 du Code national am ricain de l lectricit 7 Risque d lectrocution Ne pas enlever le cordon d alimentation ni le distributeur de tension m can...

Страница 10: ...d autres droits qui varient d une province l autre GARANTIE LIMIT E Le fabricant garantit l acheteur et au propri taire ult rieur pendant la p riode de garantie tout produit neuf contre tout vice de...

Страница 11: ...tiliser un tuyau de refoulement de pleines dimensions 7 Le puits doit tre conforme tous les r glements applicables 8 Avant la mise en service la pompe doit tre de niveau et le m canisme du flotteur ne...

Страница 12: ...es limites appropri es Remarque Le c ble doit tre install horizontalement Longueur du bras d attache Plage de pompage 5 10 15 20 22 9 13 5 18 22 24 5 po min 22 po max SK305 Interrupteur 20 amps mod le...

Отзывы: