background image

Figure 1 is a typical configuration for installation of the drain 

system. The actual configuration will vary depending on your

cabinet and sink configuration.

STEP 1

Determine Installation  Configuration

NOTE: This preassembled unit is designed for use with an 

external trap.

Figure 1

STANDARD INSTALLATION

SK2001

PIPING SHOWN ONLY

FOR CLARITY.

  STEP 2 

Final Assembly

  STEP 3 

Initial Testing of Drain Basin System

-   4   -

© Copyright 2019 Zoeller Co. All rights reserved.

Figure 2

NOTE: External plumbing configu-

ration will vary depending on the 

location of basin, location of main

stack and available space.

Place the basin assembly in its final

position and complete plumbing.

Secure all connections shown in

Figure 2.

EA0032

Glue on pipe thread

90° Elbow

Glue on pipe thread

1.

2.

3.

4.

5.

Plug the cord into a properly grounded GFCI receptacle.

Fill the basin with 7.5 ~ 11 liters of water and let sit for 3 ~ 4 

minutes to enable the environmentally safe peanuts to begin

dissolving.

Slowly 

ll the basin with water.

Check all plumbing for leaks as the basin fills.

Verify that the pump starts and stops. 

6.

7.

8.

Check the discharge line for leaks as the pump empties the

basin.

Repeat steps 2 through 6 as necessary to ensure proper

operation.

If problems persist, refer to the troubleshooting guide

located on page 2 of this manual.

or

Содержание 132

Страница 1: ...be checked for ground using an Underwriters Labora tory Listed circuit analyzer which will indicate if the power neutral and ground wires are correctly connected to your outlet If they are not call a...

Страница 2: ...CULAR PURPOSE AND OF MERCHANTABILITY SHALL BE LIMITED TO THE DURATION OF THE EXPRESSED WARRANTY ELECTRICAL PRECAUTIONS Before servicing a pump always shut off the main power breaker and then unplug th...

Страница 3: ...it for any visible damage caused by shipping Contact dealer if unit appears to be damaged 3 DO always disconnect pump from power source before handling DO always connect to a separately protected and...

Страница 4: ...ation of main stack and available space Place the basin assembly in its final position and complete plumbing Secure all connections shown in Figure 2 EA0032 Glue on pipe thread 90 Elbow Glue on pipe t...

Страница 5: ...1 6 Hardware Pack 1 7 Basin Seal 1 8 Unicheck 1 9 1 4 20X1 Screw S S 8 10 1 4 Flat Washer S S 16 11 1 4 20 Nut S S 8 12 Pipe Cap w o ring 2 13 O Ring 2 14 Packing 1 15 90 Elbow 1 081527 MODELS 132 133...

Страница 6: ...6 1 2 7 2019 Zoeller 1 2 2 3 4 5 1 132 133 3 4 5 7 8 6 40 50 Hz 0 3 3 54 4 3 zoellerpumps com...

Страница 7: ...7 18 5 1 2 3 4 2 5 A D G F E B C 2019 Zoeller...

Страница 8: ...8 1 2 3 4 6 7 8 9 3 5 1 2 3 4 5 6 2019 Zoeller 0 m hr 3 l min m 50 1 100 2 3 4 5 6 200 0 150 8 7 18 9 10 11 5 10 15 250 300 133 1000 133 132 133 1000 133 132...

Страница 9: ...1 1 SK2001 1 9 2 2 6 2 7 5 11 3 4 1 2 3 4 5 6 7 8 3 2 2019 Zoeller 2 EA0032 90...

Страница 10: ...084471 084472 084473 084474 084475 084476 084478 084477 084479 084480 084481 084482 084483 3 1 4 1 5 1 6 1 7 1 8 1 9 8 10 16 11 8 12 2 13 2 14 1 15 1 081527 013938 081561 013017 013732 084195 013018 0...

Отзывы: