Figure 1 is a typical configuration for installation of the drain
system. The actual configuration will vary depending on your
cabinet and sink configuration.
STEP 1
Determine Installation Configuration
NOTE: This preassembled unit is designed for use with an
external trap.
Figure 1
STANDARD INSTALLATION
SK2001
PIPING SHOWN ONLY
FOR CLARITY.
STEP 2
Final Assembly
STEP 3
Initial Testing of Drain Basin System
- 4 -
© Copyright 2019 Zoeller Co. All rights reserved.
Figure 2
NOTE: External plumbing configu-
ration will vary depending on the
location of basin, location of main
stack and available space.
Place the basin assembly in its final
position and complete plumbing.
Secure all connections shown in
Figure 2.
EA0032
Glue on pipe thread
90° Elbow
Glue on pipe thread
1.
2.
3.
4.
5.
Plug the cord into a properly grounded GFCI receptacle.
Fill the basin with 7.5 ~ 11 liters of water and let sit for 3 ~ 4
minutes to enable the environmentally safe peanuts to begin
dissolving.
Slowly
fi
ll the basin with water.
Check all plumbing for leaks as the basin fills.
Verify that the pump starts and stops.
6.
7.
8.
Check the discharge line for leaks as the pump empties the
basin.
Repeat steps 2 through 6 as necessary to ensure proper
operation.
If problems persist, refer to the troubleshooting guide
located on page 2 of this manual.
or