background image

1-1/2-in 

Discharge

pipe
Check valve

3/16-in

Vent hole

Backup 

Switch

Backup 

Switch

115 V

GFCI outlet

Basin cover

Fill with

water

1.  Place pump in a sump basin that is at least 10 in. 

wide and 18 in. deep. Install rigid 1-1/2 in. discharge 

pipe, union, and check valve according to code.

2.   Drill a 3/16 in. hole in the discharge pipe, level with 

the top of pump. Connect remaining discharge pipe 

into main discharge line. 

3.  Attach backup switch to discharge pipe

.

4.    Connect pump power supply to a  

GFCI-protected receptacle.

5.   Fill the basin with water to check operation. Install a 

basin cover and gasket on top of the basin.

SW1203Q A

QUICK REFERENCE GUIDE.   

SEE INSTRUCTION MANUAL FOR 

COMPLETE DETAILS.

WARNING:  

FOR YOUR PROTECTION, ALWAYS DISCONNECT 

PUMP FROM POWER SOURCE BEFORE HANDLING.

DUAL SWITCH  

SUBMERSIBLE SUMP PUMP 

MODEL #1099-0001Q

Zoeller

®

 is a registered trademark of Zoeller Co.  

All Rights Reserved.

ZoellerAtHome.com

Отзывы: