
Page 14 / 31
BUOYANCY TUBE – COMMISSIONING
II-2 INSTALLING THE BUOYANCY TUBE ON THE HULL
IF THE BUOYANCY TUBE WAS STORED AT A TEMPERATURE BELOW
0°C / 32°F, LEAVE IT AT 20°C / 68°F FOR 12 HOURS BEFORE
UNFOLDING.
NOTE
The buoyancy tube is fitted to the hull with the buoyancy tube
deflated
.
1
To facilitate the positioning of the buoyancy tube, apply liquid soap (A) to the hull rails.
2
A
B
Position the buoyancy tube’s (b) bolt rope (a) on the hull’s rail.
3
- Pull the buoyancy tube towards the boats stern (Do not forget to guide the upper bolt rope C).
- Repeat for the other side of the buoyancy tube
C
Содержание YACHTLINE 360
Страница 5: ...Page 5 31 E N G L I S H Seat with handles for the Yachtline 400...
Страница 8: ...Page 8 31 DESCRIPTION LOCATION OF ITEMS I 3 LOCATION OF PARTS...
Страница 11: ...Page 11 31 E N G L I S H YL 400 measurements in mm WARNING The boat must rest on the bow line see sketch below...
Страница 23: ...Page 23 31 E N G L I S H INSTALLATION AND CIRCUIT ELECTRICITY IV 2 ELECTRICAL DIAGRAM...