Page 13 / 17
E
N
G
L
I
S
H
BUOYANCY CHAMBER – Main steps
II-1-SETTING UP THE BUOYANCY CHAMBER – MAIN STEPS
When assembling the boat, it is important that you follow the procedure in the correct order. Proceed
step by step, referring each time to the pages indicated for explanations.
INFLATION PROCEDURE
PAGE
SECTION
1. Make an inventory of all your boat’s components and
learn to recognize them
6 - 8
Inventory
Location
2. Start inflating the boat
using working pressure
14 & 15
Inflating the boat
16 & 17
Air pressure
II-2-INFLATION SYSTEM
THE INFLATION PUMP
a. adaptor
b. tube nozzle
c. tube connector
d. inflation port
a
b
c
d
SEMI FLUSH-MOUNTED VALVES
To change position
In inflating position
In deflating position
Push
The membrane is closed, the
knob is up
The membrane is open, the
knob is down
NOTE:
The Easy push valve plugs are designed to be
screwed on or off; they alone provide final
airtightness.
Содержание PRO 500
Страница 1: ...Manuel du Propri taire Tome 2...
Страница 12: ...Page 12 sur 17 B Echelle de bain conseil de positionnement...
Страница 18: ...Owner s Manual Volume 2...
Страница 29: ...Page 12 of 17 B Boarding ladder recommended position...
Страница 35: ...Manual del propietario Tomo 2...
Страница 46: ...P gina 12 de 17 B Escala de ba o consejo de colocaci n...
Страница 52: ...Manuale del Proprietario Volume 2...
Страница 63: ...Pagina 12 17 B Scaletta bagno consiglio di posizionamento...
Страница 69: ...Eignerhandbuch Teil 2...
Страница 80: ...Seite 12 17 B Badeleiter Empfohlene Anordnung...