Page 39 / 65
Issue 2
E
N
G
L
I
S
H
INSTALLATION AND CIRCUIT
With twin engines, a second battery is
required. A load insulator is often built
into the engine’s design. It job is to
recharge the batteries while the engine
is running.
The coupler system enables the engines
to be started with either one battery, or
by coupling the batteries (in parallel), or
start them with a single battery if the
other is faulty.
Engine A starts with batteries 1 and 2.
Engine B starts with batteries 1 and 2.
Содержание MEDLINE 9
Страница 1: ...Volume 2 MEDLINE 9 613 087 A CAREFULLY READ THIS MANUAL BEFORE PUTTING YOUR ZODIAC INTO SERVICE...
Страница 15: ...Page 15 65 Issue 2 E N G L I S H DESCRIPTION Handling...
Страница 34: ...Page 34 65 Issue 2 INSTALLATION AND CIRCUIT ELECTRICAL V 2 1 COMFORT Fuse box...
Страница 35: ...Page 35 65 Issue 2 E N G L I S H INSTALLATION AND CIRCUIT V 2 1 EQUIP NAV fuse box...
Страница 55: ...Page 55 65 Issue 2 E N G L I S H LABELLING VI LABELLING VI 1 POSITION OF LABELS 3 4 5 6 1 2 7...
Страница 56: ...Page 56 65 Issue 2 LABELLING VI 2 DESCRIPTION OF LABELS...