Page 37 / 63
Issue 2
E
N
G
L
I
S
H
INSTALLATION AND CIRCUIT
With twin engines, a second battery is
required. A load distributor is most often
built-in to the engine to recharge the
batteries when the engine is running.
The coupler system enables the engines
to be started with either one battery, or
by coupling the batteries (in parallel), or
start them with a single battery if the
other is faulty.
Engine A starts with batteries 1 and 2.
Engine B starts with batteries 1 and 2.
ENGINE B
ENGINE A
BATTERY 1
BATTERY 2
Содержание Medline 9 2022
Страница 13: ...Page 13 63 Issue 2 E N G L I S H DESCRIPTION Handling...
Страница 32: ...Page 32 63 Issue 4 INSTALLATION AND CIRCUIT ELECTRICAL V 2 1 COMFORT Fuse box...
Страница 33: ...Page 33 63 Issue 2 E N G L I S H INSTALLATION AND CIRCUIT V 2 1 EQUIP NAV fuse box...
Страница 38: ...Page 38 63 Issue 4...
Страница 54: ...Page 54 63 Issue 4 LABELLING VI LABELLING VI 1 POSITION OF LABELS 3 4 5 6 1 2 7...
Страница 55: ...Page 55 63 Issue 2 E N G L I S H LABELLING VI 2 DESCRIPTION OF LABELS...