Page 43 / 55
Issue 1
E
N
G
L
I
S
H
Sheath 1: Used to route the engine supply
Sheath 2: Used to route the steering cables
Sheath 3: Used to route the electrical wiring harness and the engine wiring harness (not
supplied)
Sheath 4: Used to route the navigation light cable and the windlass wiring harness (not
supplied)
INSTALLATION AND CIRCUIT - Anchoring/mooring
V-7 ANCHORING/MOORING
Ref.
DESCRIPTION
1
Aft bollards
2
Polyester bow roller with stainless steel bow roller
3
Anchor locker
1
1
2
6
5
3
6
4
Sheath 4 Ø50
Sheath 1 Ø80
Sheath 2 Ø50
Sheath 3 Ø80
Содержание MEDLINE 7.5
Страница 1: ...Volume 2 MEDLINE 7 5 612 529 A CAREFULLY READ THIS MANUAL BEFORE PUTTING YOUR ZODIAC INTO SERVICE ...
Страница 28: ...Page 28 55 Issue 2 INSTALLATION AND CIRCUIT ELECTRICAL 16 17 ...
Страница 31: ...Page 31 55 Issue 1 E N G L I S H INSTALLATION AND CIRCUIT ELECTRICAL 17 ...
Страница 46: ...Page 46 55 Issue 2 VI 1 POSITION OF LABELS 3 4 5 6 1 2 7 ...
Страница 47: ...Page 47 55 Issue 1 E N G L I S H LABELLING VI 2 DESCRIPTION OF LABELS ...
Страница 49: ...Page 49 55 Issue 1 E N G L I S H ...