Page 44 / 50
Edition 2
INSTALLATION AND CIRCUIT – DRAINAGE
CAUTION!
REGULARLY CHECK BILGE PUMP OPERATION (REFER TO THE
INSTRUCTIONS) AND CLEAN THE SUCTION POINTS TO REMOVE ANY
DEBRIS THAT MAY BUILD UP AND OBSTRUCT THEM.
Your pump can handle a flow rate of approx. 45 litres per minute. It is accessible through the aft
locker
.
7.4.
Hull outlet:
Boat out of the water (on a trailer, cradle, etc.)...
OPEN POSITION, OUTLET CAP REMOVED.
Boat in the water...
CLOSED POSITION, OUTLET CAP IN PLACE.
(ALWAYS ENSURE THAT THE OUTLET CAP IS
PROPERLY CLOSED/TIGHT).
Содержание MEDLINE 6.8
Страница 29: ...Page 29 50 Edition 1 E N G L I S H INSTALLATION AND CIRCUIT ELECTRICALS 6 2 Console wiring loom diagram ...
Страница 30: ...Page 30 50 Edition 2 INSTALLATION AND CIRCUIT ELECTRICALS 6 3 Hull wiring loom diagram ...
Страница 48: ...Page 48 50 Edition 2 SIGNAGE 13 WARNING AND SAFETY STICKERS 13 1 STICKER POSITIONS 3 4 5 6 1 2 2 3 4 5 6 1 ...
Страница 49: ...Page 49 50 Edition 1 E N G L I S H SIGNAGE 13 2 STICKER DESCRIPTIONS ...