3.  If a draw wire is not being used, the cable 

(P/N WT000268 or WT000269) must be fitted 

simultaneously with the conduit installation. 

Starting at the niche, run the cable though 

the conduit to the power supply. Leave 1m of 

cable surplus inside the niche, complete with 

the end of the cable with the plug, and coil 

up inside the niche until ready to fit the light. 

Ensure the cable gland inside the niche is fully 

tightened around the cable.

4.  Install a second conduit to return below 

ground level and away to the power supply. 

Both conduits should be glued into a draw box 

to allow for future service. See Figure 2.

NOTE: 

Ensure the conduits are “broken” (even if not 
using a junction box) before returning below 
water level to stop water siphoning from pool or 
spa,

Niche

Steel

Reinforcement

Bars

Concrete

Wall

Conduit to

Power Supply

50mm Minimum

Concrete

Thickness

25mm

Electrical

Conduit

to Inlet

 Junction Box

Scoop out

concrete

and apply

sealant

“Broken”

Conduits 

Figure 2.  Concrete Niche Installation

5.  Press the larger polystyrene foam insert (P/N 

26938) into the niche’s front opening. This 

temporary insert will stop dirt, concrete and 

debris entering the niche and will maintain 

roundness of the niche under the weight of the 

concrete. The foam insert must be a tight fit 

inside the niche.

6.  Cover the entire niche surface with concrete 

in a uniform manner to ensure secure fixing. 

Ensure the concrete covers the niche all 

around and at the back – air pockets and 

bubbles in the concrete must be eliminated. 

Avoid creating thin sections of concrete to 

minimise the risks of cracking or leaks. It is 

imperative the front edge of the niche does not 

stand proud of the concrete or sit recessed to 

the concrete. Ensure there is at least 50mm of 

concrete behind the niche.

7.  Smooth the concrete around the niche and 

make a recess around the rim of approximately 

8mm, to allow for installation of a waterproof 

seal. See Figure 3.

Mounting

Ring

Concrete

Apply

Waterproof

Sealant

to Recess

Apply PVC Solvent

NOTE:

 Locate “X”

at 12 o’clock and 

screw hole at 

6 o’clock positions. 

Figure 3.  Mounting Ring for Concrete Niche

8.  When the concrete has dried, remove the foam 

cover from the niche. Fill the recess around the 

niche with a waterproof sealant (2 part epoxy). 

Keep the sealant flush with the niche front 

edge and concrete wall surface. 

9.  To install the light mounting ring into the niche:

 

Apply PVC cement to the swivel surface of 

the mounting ring (item 75811) and also to 

the inside of the niche where the mounting 

ring is likely to rest (approx. 20mm inside 

niche). See Figure 3.

 

For easier installation and maintenance of 

the light, it is highly recommended that the 

mounting ring be installed according to the 

following description. The mounting ring has 

a large “X” mark that should be installed into 

the niche such that the marker is at the 12 

o’clock position. Refer to Figure 3, which 

highlights the marker and its correct position. 

Press the mounting ring into the niche, with 

the marker at 12 o’clock, until the ring sits 

flush against the pool concrete wall. Check 

for correct installation before the glue sets. 

See Note in Figure 3 for correct orientation.

Содержание LumiPower Light

Страница 1: ...w all warning notices and instructions that accompany this product Failure to follow warning notices and instructions may result in property damage personal injury or death Improper installation and o...

Страница 2: ...rranty and complete your details Or scan the QR code to go directly to the registration page EQUIPMENT INFORMATION RECORD DATE OF INSTALLATION _________________________________________________________...

Страница 3: ...Concrete Niche Assembly Installation Manual Table of Contents SAVE THESE INSTRUCTIONS Section 1 Important Safety Instructions 4 1 1 Safety Instructions 4 Section 2 Package Contents 5 Section 3 Concre...

Страница 4: ...opies of these instructions NOTICE The Zodiac Pool and Spa niches are intended for installation in fresh water and salt water swimming pools and spas It is important to ensure that the lights in which...

Страница 5: ...ed before the concrete is poured Once poured the remainder of the steps can then be taken 1 Using soft wire or cable ties attach the niche P N 75810 C to the steel reinforcement The conduit inlet shou...

Страница 6: ...e back air pockets and bubbles in the concrete must be eliminated Avoid creating thin sections of concrete to minimise the risks of cracking or leaks It is imperative the front edge of the niche does...

Страница 7: ...ting ring See Figure 4 NOTE Tiled interior pool surface must be finished flush with raised edge of mounting ring Waterproof Sealant Concrete Tile and Glue or Render Mounting Ring Cable Plug Protective...

Страница 8: ...1 965 Zodiac com au 1300 763 021 Fluidra NZ Ltd 13 Douglas Alexander Parade Rosedale Auckland 0632 New Zealand NZBN 942 903 181 70759 Zodiac co nz 0800 807 665 A Fluidra Brand 2023 ZODIAC is a registe...

Отзывы: