
/ 9
4
ASSEMBLY
Choose a smooth and clean surface
.
IF THE BUOYANCY TUBE WAS STORED AT A TEMPERATURE
BELOW 0°C / 32°F, LEAVE IT AT 20°C / 68°F FOR 12 HOURS
BEFORE UNFOLDING.
THE H2P INFLATABLE FLOOR:
H2P INFLATABLE FLOOR DEFLATED
Your boat is delivered with the inflatable floor and its keel already assembled.
Cadet fast roller Acti-V - Air floor Inflating procedure:
•
Before inflating, open out the boat and position the keel on the central band of the bottom and on
the floorboard axis (centered between the positioning pins).
•
FIRST
inflate the keel-floorboard assembly to its rated pressure.
•
Check that the keel inflated perpendicular to the floorboard and that it is still positioned on the
central band of the bottom (otherwise, reposition).
•
Inflate the main buoyancy tube.
•
Press the floorboard down around the edges to fit it into the hollow of the angle.
MAINTENANCE / DISMANTLE OF THE H2P INFLATABLE FLOOR
We recommend that you leave the H2P floor in the boat when folding.
To clean perfectly the boat proceed as follow :
Deflate the boat and the floor.
inflate again the boat a little.
Wash off with clear water, then raise the boat’s nose to evacuate water and sand or rubbish.
Do not separate the keel from the floor nor from the buttom.
Содержание CADET AERO
Страница 11: ......