background image

 

MANUAL NAME: LBB051100A Residential Energy Storage Box User Manual         

                                      REV NO.

.: V1.2

 

Date: November 4, 2019 

 

ZHONGNENG TECHNOLOGY (HANGZHOU) CO., LTD 

25 

warranty commences for the period of five years from the earlier of: 

(1)

 

The date of installation of the Product. 

(2)

 

Six months after the date the product was manufactured. 

This warranty does not include any accessories and tool kit items provided with the Product. 

ZNTECH  will  repair  or  replace the Product  if  the  product  is defective  and  returned during  the Warranty 

Period. 

ZNTECH offers another five years of performance guarantee after the 5-year warranty expires. You can have 

ZNTECH repair the Product at a cost. 

9.1

 

Warranty Conditions 

The warranties in respect of the Product only apply if the Product: 

(1)

 

Is purchased from ZNTECH or an Authorized Reseller in the Territory; 

(2)

 

Has the official ZNTECH serial number; 

(3)

 

Is installed in the Territory; 

(4)

 

Is installed, operated and maintained in accordance with the Product Manual; and 

(5)

 

Be used on a daily cycle basis and only for energy storage system. 

(6)

 

Falls within the Warranted Period   

Any Product failure, fault or warning information must be reported in the form of Warranty Claim stated in 

Clause 10 to ZNTECH or ZNTECH authorized service partner within 2 weeks of appearance. 

The warranty will be void if the defect in or failure of the product’s performance is attributable to your misuse, 

abuse, accident or non-observance of the Product. 

9.2

 

  Warranty Claim 

If a Product fails within the Warranty Period, the end-user must stop using the Product or the system in which 

the Product is installed, as the case may be, by isolating the Product from any energy source, making a claim 

as soon as possible and following all instructions provided by us, or our representative or agents. 

To make a Warranty claim under this voluntary warranty, the end-user must contact us at:   

Address: 

NO.245, BINKANG RD., CHANGHE ST., BINJIANG DISTRICT, HANGZHOU, ZHEJIANG/ 

NO.799, YAOCHENG AVENUE, CMC, TAIZHOU, JIANGSU 

Post Code:

 310000 

Telephone

0086-523-82713786   

Fax:

 0086-523-86226716 

Email: 

[email protected] 

Содержание LBB051100A

Страница 1: ...Name Residential Energy Storage Box User Manual Product Model LBB051100A Date 04 11 2019 Add NO 245 BINKANG RD CHANGHE ST BINJIANG DISTRICT HANGZHOU ZHEJIANG NO 799 YAOCHENG AVENUE CMC TAIZHOU JIANGSU...

Страница 2: ...Installation 11 5 1 Items in the Box 11 5 2 Installation Precautions 12 5 3 Clearance 13 5 4 Tools and Safety Gear 13 5 5 Installation Steps 14 5 6 Wiring 16 5 7 Use of D C isolating Switch 19 6 Inst...

Страница 3: ...Residential Energy Storage Box User Manual REV NO V1 2 Date November 4 2019 ZHONGNENG TECHNOLOGY HANGZHOU CO LTD 2 1 Safety Rules 1 1 Symbol and Terms 1 Product Label 2 Warning label Explanation of t...

Страница 4: ...n minor injuries or minor or moderate damage to the equipment and property Do not short the battery Do not disconnect or disassemble by non professionals Don not use water to extinguish fire Do not pl...

Страница 5: ...before operating the battery 6 When climbing during maintenance pay attention to safety to prevent people from falling or batteries from falling 7 When connecting high voltage power cords use insulat...

Страница 6: ...nnect the power by following the shutdown procedure and contact the supplier for repair 20 During installation of the battery the utility grid and solar input must be disconnected from the Battery sys...

Страница 7: ...em is on fire do not try to extinguish but evacuate people immediately 1 3 3 Wet Batteries If the battery system is wet or immersed in water please do not approach it and contact ZHONGNENG Technology...

Страница 8: ...o modules in series to form a 1P16S LBB051100A system Lithium ion batteries include positive and negative plates separators electrolytes battery containers and safety valves Note The following single...

Страница 9: ...MANUAL NAME LBB051100A Residential Energy Storage Box User Manual REV NO V1 2 Date November 4 2019 ZHONGNENG TECHNOLOGY HANGZHOU CO LTD 8 Figure 2 Outline of the battery system...

Страница 10: ...Current 50Ad c Standard Discharge Current 50Ad c Maximum Discharge Continuous Current 70Ad c Maximum Discharge Pulse Current 100Ad c 30s 25 2 SOC 40 Operation Temperature Range 0 55 charge 20 55 disch...

Страница 11: ...cation Socket RCP 5SPFFH TCU7001 Amphenol rj45 CAN 3 Communication Socket RCP 5SPFFH TCU7001 Amphenol rj45 CAN 485 4 Positive Socket C10 730187 010 Amphenol red 25mm2 5 Positive Socket C10 730187 010...

Страница 12: ...stem has been tested and checked strictly but it still may be damaged during transporting so please check it carefully Inspect the battery s appearance if any shipping damage is found report it to the...

Страница 13: ...e in the battery installation instructions and you must firmly fix the wiring It is strictly forbidden to short circuit the positive and negative terminals of the battery and touch the two terminals o...

Страница 14: ...ear The following tools are required to install the battery system Wire cutter Crimping Modular Plier Screw Driver Note Use properly insulated tools to prevent accidental electric shock or short circu...

Страница 15: ...mage to the product 5 5 Installation Steps 5 5 1 Cabinet fixing example Figure 5 Cabinet fixed installation example Steps As shown in Figure 1 above use 4 M6 50 expansion screws to fix the mounting pl...

Страница 16: ...d to provide them please contact ZNTECH or an Authorized Reseller in the Territory 5 5 2 Installing Angle Bracket Figure 6 Lock the left and right corner Steps As shown in Figure 6 place the battery s...

Страница 17: ...ple of installation diagram of single battery system into a cabinet Steps As shown in Figure 7 put the battery system into the cabinet and fix it with six M6 x 12mm external hexagon combination screws...

Страница 18: ...wiring reference diagram of the battery system is as follows Figure 9 Installation diagram of single battery system Warning The cross sectional area of the Earth conductor shall not be less than 6 mm...

Страница 19: ...nication port on the right side of the cabinet and then use RJ45 to connect it to the PCS inverter communication port 3 Use the M6 x 6mm pan head screw to fix one end of the ground wire of the pressed...

Страница 20: ...ating switch is Nader DC80V 63A DC D C isolating switch The reference figure is as follows Figure11 Schematic diagram of D C isolating switch The system current changes after different Numbers of pack...

Страница 21: ...normal During normal operation the green light is always on 9 The power system needs to check the insulation resistance before each use to prevent battery leakage 10 When the power system is shipped f...

Страница 22: ...prior to the alarm System protection The red light blinks for 0 5 seconds every 2 seconds The green light continues to operate in the same manner as immediately prior to the alarm Other alarm Table 5...

Страница 23: ...tory Note Pay attention to electrical protection for unplugged communications and cables use temporary terminal blocks or insulating tape to insulate all wire ends as they are disconnected Ensure wire...

Страница 24: ...aging for damage at the time of receipt Check that the goods are complete and check according to the order on the packing list After unpacking check that the internal parts are intact If you find any...

Страница 25: ...erms specified in this manual have been added deleted or modified from the original without the consent of the manufacturer or supplier then the manufacturer supplier shall not bear any related liabil...

Страница 26: ...accordance with the Product Manual and 5 Be used on a daily cycle basis and only for energy storage system 6 Falls within the Warranted Period Any Product failure fault or warning information must be...

Отзывы: