background image

2

2.12. Please make sure that there is no gap between the insulating gaskets of the joint. The gap

between the insulating gaskets may cause the fire and electric shock risk.

2.13. Please make sure that the polarity of each module or string is not the opposite with that of

other module or string.

2.14. Please don't artificially gather sunlight on these solar modules.
2.15. Under normal circumstances, the current and voltage generated by PV modules maybe

higher than those reported under standard test conditions on certain conditions.

3.Unpacking and storage

3.1. Please keep all components and electrical connections clean and dry before starting the

installation.

3.2. If a temporary storage module is required, a dry and ventilated room shall be used.

3.3. When unpacking, the modules shall be handled by both hands. Don't place the modules in

an overlapping mode.

3.4. The double glass modules should be carefully handled, and it is required to use slip-proof

gloves in the process of handling and installation.

3.5. Please use the supportive with disassembly tools when disassembling the plywood case.

4.Product identification

It is recommended to record the unique serial number of each module.

5.Environmentalconditionsandsiteselection

5.1 Weather conditions

The installation of ZNSHINE SOLAR AUSTRALIA PTY LTD. crystal series modules

should be carried out under the following conditions:

Environment temperature: -40 °C to +40°C

Working temperature: -40 °C to +85°C

Storage temperature: -20 °C to +40°C

Humidity: less than 85RH%

※The mechanical load capacity of module (including wind force and snowfall load) depends on

Содержание ZXM6- TD72- 370/M

Страница 1: ...Installation Manual for Double Glass June 27 2018...

Страница 2: ...Clamped installation 3 6 1 Module overview 3 6 2 Material list 4 6 3Installation method 5 6 4 Compatibility of ZNSHINE SOLAR AUSTRALIA PTY LTD clamp clamped with each frame system 6 6 6 Selection sche...

Страница 3: ...ng shall be firstly fused and then connected to other modules strings For the maximum fuse rating please refer to the detailed specifications in the last page 2 3 Photovoltaic PV modules will generate...

Страница 4: ...required a dry and ventilated room shall be used 3 3 When unpacking the modules shall be handled by both hands Don t place the modules in an overlapping mode 3 4 The double glass modules should be car...

Страница 5: ...beaches or land fill areas that are prone to suffer from pluvial erosion 5 2 4 Please don t install the PV modules in areas where they may be immersed in water or continuously exposed to a sprinkler o...

Страница 6: ...pressing block type installation system Item Name Picture Dimension mm Material 1 Clamp Length and width 150 50 Aluminumalloy6063 2 Clamp splice Length and width 150 60 Aluminumalloy6063 3 EPDM Lengt...

Страница 7: ...ter and firstly get familiar with the whole process and then start the installation In addition please complete all the site preparations before installation Installation suitable for double glass pre...

Страница 8: ...tighten the nuts M6SS304 6N m 8N m Place the clamp inside the track on the frame M8SS304 Insert the module into the pressing block and install the pressing block and finally tighten the nuts M8ss304...

Страница 9: ...r not Please find the following dimensions before evaluating the frame system If it is required to change the screw size please contact ZNSHINE SOLAR AUSTRALIA PTY LTD please note that the unit used i...

Страница 10: ...to use the T type cap Example B C type steel frame installation ZNSHINE SOLAR AUSTRALIA PTY LTD recommends using M8 bolt fixing clamp The tightening torque of M8screw is 16 20N M In the selection of c...

Страница 11: ...load pressure Clamp length Mounting direction 60pcs Double Glass 2400 1 5 Pa 1600 1 5Pa 150mm The above distance refers to that from edge of module to center of clamp 72pcs Double Glass 1600 1 5Pa 16...

Страница 12: ...10...

Страница 13: ...e ZNSHINE SOLAR AUSTRALIA PTY LTD PV modules connected in serial should be installed in accordance with the same orientation and angle Any different orientations or angles may result in the different...

Страница 14: ...12 10 Care and maintenance 10 1 PANEL VISUAL INSPECTION AND REPLACEMENT...

Страница 15: ...spect all cables to verify that connections are tight the cables are protected from direct sunlight and sited away from areas of water collection It is recommended to check the torque of terminal bolt...

Страница 16: ...erial 11 Specification Module Series 60pcs 156 75 156 75mm Polycrystalline Silicon DOUBLE GLASS Module Dimensions mm Weight kg 1658 992 6 Max System Voltage VDC 1500 Max Series Fuse A 15 Electrical Pe...

Страница 17: ...39 5 Max Power Current Imp A 9 36 9 44 9 52 9 60 9 67 9 75 Open Circuit Voltage Voc V 47 3 47 5 47 7 47 9 48 1 48 3 Short Circuit Current Isc A 10 05 10 06 10 07 10 08 10 09 10 10 12 Bypass diode and...

Страница 18: ...urrent IF AV is higher than the maximum system current at the highest operating temperature of module The peak repetitive reverse voltage VRRM is higher than the maximum system voltage at the lowest o...

Отзывы: