background image

11

7.

Module wiring

Each module is provided with two standard 90℃ lighter Diameter of 4mm2,each of which

is connected with the plug and mobile connector. This cable can be used in the condition of line
exposed to direct sunlight. Our company recommends that all wiring and electrical connections
shall comply with the relevant national electrical codes.

For the field connections, please use the copper wire with a diameter not less than4mm2

and sunlight resistance not less than 90℃.

The outside diameter of cable should range from 5mm to 7mm. See the specification part

for the maximum electrical rated parameters of serial fuse.

8.

Tilt angle of module

ZNSHINE SOLAR AUSTRALIA PTY LTD. PV modules connected in serial should be

installed in accordance with the same orientation and angle. Any different orientations or angles
may result in the different amounts of solar radiation received by each module, thus leading to
the loss of output power.

The maximum power generation efficiency can be achieved when ZNSHINE SOLAR

AUSTRALIA PTY LTD. PV modules orientate right angle towards the sunlight. If it is
required to install the PV modules on a permanent structure, the tilt angle shall be adjusted
to the optimum winter use. The tilt angle of module should be determined according to the
situation between the solar module and ground. The optimum tilt angle of PV module is the
same as latitude of installation position in most cases.

9.

Mechanical drawing of module

Mechanical drawing of clamped module

Содержание ZXM6- TD72- 370/M

Страница 1: ...Installation Manual for Double Glass June 27 2018...

Страница 2: ...Clamped installation 3 6 1 Module overview 3 6 2 Material list 4 6 3Installation method 5 6 4 Compatibility of ZNSHINE SOLAR AUSTRALIA PTY LTD clamp clamped with each frame system 6 6 6 Selection sche...

Страница 3: ...ng shall be firstly fused and then connected to other modules strings For the maximum fuse rating please refer to the detailed specifications in the last page 2 3 Photovoltaic PV modules will generate...

Страница 4: ...required a dry and ventilated room shall be used 3 3 When unpacking the modules shall be handled by both hands Don t place the modules in an overlapping mode 3 4 The double glass modules should be car...

Страница 5: ...beaches or land fill areas that are prone to suffer from pluvial erosion 5 2 4 Please don t install the PV modules in areas where they may be immersed in water or continuously exposed to a sprinkler o...

Страница 6: ...pressing block type installation system Item Name Picture Dimension mm Material 1 Clamp Length and width 150 50 Aluminumalloy6063 2 Clamp splice Length and width 150 60 Aluminumalloy6063 3 EPDM Lengt...

Страница 7: ...ter and firstly get familiar with the whole process and then start the installation In addition please complete all the site preparations before installation Installation suitable for double glass pre...

Страница 8: ...tighten the nuts M6SS304 6N m 8N m Place the clamp inside the track on the frame M8SS304 Insert the module into the pressing block and install the pressing block and finally tighten the nuts M8ss304...

Страница 9: ...r not Please find the following dimensions before evaluating the frame system If it is required to change the screw size please contact ZNSHINE SOLAR AUSTRALIA PTY LTD please note that the unit used i...

Страница 10: ...to use the T type cap Example B C type steel frame installation ZNSHINE SOLAR AUSTRALIA PTY LTD recommends using M8 bolt fixing clamp The tightening torque of M8screw is 16 20N M In the selection of c...

Страница 11: ...load pressure Clamp length Mounting direction 60pcs Double Glass 2400 1 5 Pa 1600 1 5Pa 150mm The above distance refers to that from edge of module to center of clamp 72pcs Double Glass 1600 1 5Pa 16...

Страница 12: ...10...

Страница 13: ...e ZNSHINE SOLAR AUSTRALIA PTY LTD PV modules connected in serial should be installed in accordance with the same orientation and angle Any different orientations or angles may result in the different...

Страница 14: ...12 10 Care and maintenance 10 1 PANEL VISUAL INSPECTION AND REPLACEMENT...

Страница 15: ...spect all cables to verify that connections are tight the cables are protected from direct sunlight and sited away from areas of water collection It is recommended to check the torque of terminal bolt...

Страница 16: ...erial 11 Specification Module Series 60pcs 156 75 156 75mm Polycrystalline Silicon DOUBLE GLASS Module Dimensions mm Weight kg 1658 992 6 Max System Voltage VDC 1500 Max Series Fuse A 15 Electrical Pe...

Страница 17: ...39 5 Max Power Current Imp A 9 36 9 44 9 52 9 60 9 67 9 75 Open Circuit Voltage Voc V 47 3 47 5 47 7 47 9 48 1 48 3 Short Circuit Current Isc A 10 05 10 06 10 07 10 08 10 09 10 10 12 Bypass diode and...

Страница 18: ...urrent IF AV is higher than the maximum system current at the highest operating temperature of module The peak repetitive reverse voltage VRRM is higher than the maximum system voltage at the lowest o...

Отзывы: