background image

Shanghai ZLAN Information Technology Co., Ltd          Tel: +86-17321037177          http://www.zlmcu.com 

ZLAN8100  according  to  their  own  needs,  and  then  the  DTU  can  enter  the  normal 

mode of work. 

2)  Normal Working Mode 

After the initialization phase, DTU will enter the work mode of data transmission. In 

this mode, the device's serial port will transparently receive and send the user's data. 

Please refer to user interface configuration for user data control parameters. 

3)  User Configuration Mode 

When  the  system  starts  initialization,  you  can  enter  the  configuration  mode  after 

receiving the specified command, and DTU can enter the user configuration mode. 

At  this  time,  the  serial  port  of  the  device  has  been  transferred  to  the  configuration 

status,  can  use  ZLAN  “ZLAN8100  Configuration  Assistant”  tool  to  configure.  After 

the  configuration  is  completed,  with  power  on  the  device  can  be  in  use.  For 

customers  who  need  to  develop  their  own  configuration  code,  please  refer  to 

<ZLAN8100 Configuration Instructions>. 

6.  Optional Work Station Instruction 

The GPRS DTU device of ZLAN technology supports the following two working modes, 

and users can set reasonable working mode in combination with actual communication 

requirements. In general, the system needs real-time query and timely reporting using 

real-time online working mode to ensure the validity of data. In the case that only there is 

data so need to report, it can use work mode of data to trigger the online. 

6.1 Normal Working Mode 

1)  Real-time Online 

DTU  device  maintain  effective  data  link  connection  with  data  center,  it  can  do 

real-time data communication between the two, the actual application can adopts 

connection-oriented  TCP  method,  and  combined  with  a  heartbeat  packets  to 

maintain  connection,  also  can  use  the  non-connection-oriented  UDP  method 

provided by this device, plus the heartbeat packets to maintain connections, as a 

result  of  the  UDP  packet  routing  address  jump  degeneration  is  big,  user  can 

narrow the heartbeat interval, to keep the data center can prompt reply. 

Содержание ZLAN8100

Страница 1: ...1 ZLAN8100 GPRS DTU Data Transmission Device User Manual RS232 485 To GPRS Solution Copyright Shanghai ZLAN Information Technology Co Ltd All right reserved Document DI ZL DUI 20140421 1 0 ...

Страница 2: ...t notice It is against the law to copy the document on any medium except as specifically allowed in the license or nondisclosure agreement The purchaser may make one copy of the document for backup purposes No part of this manual may be reproduced or transmitted in any form or by any means electronic or mechanical including photocopying recording or through information storage and retrieval system...

Страница 3: ...ce Parameters 10 3 Landing Device 11 4 Setting Parameters 11 5 Advanced Parameters 11 7 Usage 12 8 Parameter Instruction 14 8 1 General Parameters 14 8 2 Advanced Parameters 14 8 3 Equipment AT instruction 15 1 Enter Configuration Mode 15 2 Login 15 3 Acquisition Device Status 15 4 Get Serial Parameters 15 5 Set Serial Parameters 16 6 Get Network Parameters 16 7 Setting Network Parameters 17 8 Dev...

Страница 4: ... with built in watchdog it has stable and reliable performance The product use 2 band GSM GPRS module the working frequency band is EGSM 900MHZ and DCS 1800MHZ It provides standard RS232 485 data interface can conveniently connect with devices such as RTU PLC IPC only needs one time to finish initialization configuration The user device can establish connections with data center through GPRS wirel...

Страница 5: ...nter can be connected to ZLAN8100 GPRS DTU Figure 2 Connection Diagram 2 Feature 1 Support user data transparent transmission 2 Support connecting data center through fixed IP and dynamic domain name resolution methods 3 Support TCP UDP SMS three data link communication modes 4 Support two working mode real time online and data triggering online 5 Support TCP UDP link online to send custom registr...

Страница 6: ...x 1400mA 9V Operating Temperature 40 85 Running temperature 40 125 Storage temp 0 95 Non Condensing Size 9 4cm 6 5cm 2 5cm 4 Hardware Instruction The front view of ZLAN8100 DTU is shown as FIG 1 Installation instructions 1 Antenna installation the device antenna interface adopts 50Ω SMA female the external antenna must use the antenna suitable for GPRS work band if use other antenna that not match...

Страница 7: ...ght 2 LINK 64ms on 3000ms off indicating that GPRS is normally registered and other scintillation frequency indicates GPRS registration abnormality 3 POWER red indicates that ZLAN8100 has already been power on 4 GPRS light GPRS operating status indicator Figure 3 Interface ZLAN8100 side interface The interface is shown as FIG 3 1 Power input terminal type DC9 24V 2 RS485 signal input 3 RJ45 interf...

Страница 8: ...heir own configuration code please refer to ZLAN8100 Configuration Instructions 6 Optional Work Station Instruction The GPRS DTU device of ZLAN technology supports the following two working modes and users can set reasonable working mode in combination with actual communication requirements In general the system needs real time query and timely reporting using real time online working mode to ensu...

Страница 9: ...time Until there is data from the serial port it will be triggered online and the data will be reported After that if the data is not available for a period of time it will be automatically removed 6 2User Configuration Mode In this mode the basic working parameters of the device can be obtained and the user can modify the work parameters according to the locale The specific steps are as follows 1...

Страница 10: ... the device will be checked out vi This process lasts for up to 30 seconds and the timeout cannot enter configuration mode The basic information of the device is shown in FIG 5 and the more commonly used is the TCP IP parameter which is listed here in the main interface The information box section is the data returned by the AT command Figure 5 Device Information 2 Obtain Device Parameters When th...

Страница 11: ... the LOGIN is successful the LOGIN status will change otherwise LOGIN failed please confirm whether the password is correct or not 4 Setting Parameters Modify the parameters you need to change if the parameters need to be valid and click Set Param After setting the parameters there is no obvious prompt information If the information of the parameter box is consistent with the set information the m...

Страница 12: ... for the client s connection request If the server is an Intranet connected to a router a port mapping is required to establish a connection Here we assume that the user server has a public network IP address Next is the 8100 DTU Settings as shown in FIG 8 sets the destination address using the configuration tool to fill the Dest IP Name with Server IP and fill the Dest with port put the device on...

Страница 13: ...Shanghai ZLAN Information Technology Co Ltd Tel 86 17321037177 http www zlmcu com 13 Figure 8 Setting Destination Address Wait a moment 8100 will connect to the server ...

Страница 14: ...the serial port will be set according to the saved parameters 2 Login Password The password is used in when login in the device to modify parameters 3 Baud Rate Baud rate for device normal communication 4 Destination IP or Domain Name The IP address of the server 5 Destination Port Server software port 6 Protocols Network communication transport protocol TCP UDP 8 2Advanced Parameters 7 Work Param...

Страница 15: ... enter configuration mode after the device is started Return CFG MODE r 2 Login Command ZL LOGIN 666666 r n Function log in modify the device parameters to be successful when must be logged in Return LOGIN OK r n success or LOGIN NG r n failure 3 Acquisition Device Status Command ZL STAT The r n Function check the signal strength temperature and voltage of the device Return STAT strength temperatu...

Страница 16: ... Returns BAUD n r n Command ZL CHECKB N O E r n Function set parity bit Returns CHECKB N O E r n N None Parity O Odd Parity E Even parity Command ZL DATAB 5 6 7 8 r n Function sets the data bit Returns DATAB 5 6 7 8 r n 6 Get Network Parameters Command ZL PIPADD r n Role gets the destination IP or domain name Returns PIPADD ip r n Command ZL PPORT r n Role gets the destination port Returns PPORT n...

Страница 17: ...eturns PIPADD ip r n Command ZL PPORT n r n Role set destination port Returns PPORT n r n Directive ZL PROTOCOL TCP UDP r n Role set work mode Returns PROTOCOL TCP UDP r n Command ZL PDNS ip r n Role sets the DNS server IP address Returns PDNS ip r n 8 Device Working Mode Command ZL WORKTYPE r n Role get the device working mode Returns WORKTYPE 0 1 9 After Service Shanghai ZLAN Information Technol...

Страница 18: ...Shanghai ZLAN Information Technology Co Ltd Tel 86 17321037177 http www zlmcu com 18 District Shanghai CN Tel 86 21 64325189 Fax 86 21 64325200 Web http www zlmcu com Email support zlmcu com ...

Отзывы: