Installation Conditions

The equipment must be installed on concrete ground, ensuring that expansion bolts can be secured firmly.

You are suggested to install an assistant framework or fence to form a passageway, as shown in Figure 3-1.

Figure 3-1

Notes:

1. When installing the tripod turnstile against the wall, please reserve at least 100 mm space in order to
open the cover for future adjustment and maintenance.

2. The space at the end of the arm shall not be greater than 80 mm (see Figure 3-1).

3. Setting a warning line for card swiping (see Figure 3-2). A warning line is suggested to prompt users to
swipe cards in a distance, which would greatly reduce the probability of equipment failure caused by
improper operations.

Содержание TS2000PRO Series

Страница 1: ...Thank you for choosing our product Please read the instructions carefully before operation Follow these instructions to ensure that the product is functioning properly The images shown in this manual...

Страница 2: ...iliar with the design and that the said personnel have received thorough training in operating and maintaining the machine unit equipment It is further essential for the safe operation of the machine...

Страница 3: ...the machine unit equipment and such amendments shall not give any right to claim any compensation or damages under any circumstances ZKTeco shall in no way be responsible i in case the machine unit e...

Страница 4: ...t research and development of biometric verification procedures and the productization of biometric verification SDK which was initially widely applied in PC security and identity authentication field...

Страница 5: ...ion Description Button or key names for devices For example press OK Window names menu items data table and field names are inside square brackets For example pop up the New User window Multi level me...

Страница 6: ...F DEVICE 7 3 EQUIPMENT INSTALLATION 8 INSTALLATION CONDITIONS 8 CABLING 9 INSTALLATION 9 4 CABLE DIAGRAM 11 DIP K1 SWITCH CONFIGURATION 11 4 1 1 SETTING THE TURNSTILE OPENING DURATION 11 4 1 2 DIRECTI...

Страница 7: ...200 240V 50Hz 60Hz Max Tolerance of Arms Center 80 kg End 40 kg Rated Power 60 W Ingress Protection Degree IP54 Operating Environment Indoor and Outdoor shelter Arm Length mm 500 Operating Temperature...

Страница 8: ...requirements are strictly met to avoid permanent damage to the unit Input voltage AC 100 120V 200 240V Note The tripod turnstile must be connected to the ground earth 2 Power on and wait 30s for the...

Страница 9: ...form a passageway as shown in Figure 3 1 Figure 3 1 Notes 1 When installing the tripod turnstile against the wall please reserve at least 100 mm space in order to open the cover for future adjustment...

Страница 10: ...igure 3 3 the unit is millimeter Power supply and communication wire should go through the inlet Cable protection covers are suggested to use if it is surface mounted Warning The tripod turnstile must...

Страница 11: ...ntal ruler to test the levelness of the mounting plate If the mounting plate is not level adjust it by the gaskets provided Note that all the four expansion bolts must be installed properly as shown i...

Страница 12: ...d for duration setting It can be set to different values from 5s to 60s according to the following chart Bit Setting Duration Bit Setting Duration 111 5s 011 30s 110 10s 010 40s 101 15s 001 50s 100 20...

Страница 13: ...above 50 C 2 It is equivalent to IP54 waterproof under proper installation However it cannot work in the region that may suffer typhoon 3 If the temperature is 30 C a heating plate is suggested to ins...

Страница 14: ...t is damaged It is recommended that warning signs being placed at conspicuous positions for prompting passers by to pass in a proper way and in good order Reasonable maintenance consciousness helps to...

Страница 15: ...ot open after authentication It may be caused by lack of permission or a circuit problem 1 Check whether the user has the permission to open the turnstile 2 Use a multimeter to check whether the NO an...

Страница 16: ...val 1s 4 Controller Communication TCP IP 192 168 1 201 5 Turnstile Opening Duration 5s 6 Passing Direction Indicator Passing is allowed in both directions 7 Continue Passing Function Disabled 8 Alarm...

Страница 17: ...KTECO CO LTD All rights reserved Attachment 2 Connection Diagram of Control Board and Access Control Panel Warning This is a class A product In a domestic environment this product may cause radio inte...

Страница 18: ...ZKTeco Industrial Park No 26 188 Industrial Road Tangxia Town Dongguan China Phone 86 769 82109991 Fax 86 755 89602394 www zkteco com Copyright 2020 ZKTECO CO LTD All Rights Reserved...

Отзывы: