background image

3  Preparation

Below is the outline and dimensions of SBTL9000:

2

Figure 3-1

Tools:

 A measuring tape, an adjustable wrench, an impact drill and a small screwdriver (included in 

the package).

1.

2.

3.

The power and signal wires should be set separately to easily distinguish strong and weak power. 
Please invite professional personnel to complete the wiring. The device must be connected to the 
ground.

4.

Thread the connection wire of the device through the tube before assembly.

Material:

  A  PVC  anti-€re  and  insulation  tube  (diameter∫ 25mm),  standard  three-core  power 

extension  wire,  tether  cable  (random  con€guration),  M12  expansion  screws  (included  in  the 
package).

1080

271

1184

780

Содержание SBTL9000 Series

Страница 1: ...llation Guide SBTL9000 Series Version 1 0 Due to regular upgrades of systems and products ZKTeco could not guarantee exact consistency between the actual product and the written information in this ma...

Страница 2: ...any failures caused by long time operations 4 1 1 Installation Requirements The installation position of the swing barrier turnstile depends on its size A distance of 100mm between the swing barrier t...

Страница 3: ...separately to easily distinguish strong and weak power Please invite professional personnel to complete the wiring The device must be connected to the ground 4 Thread the connection wire of the devic...

Страница 4: ...e centre of the stand and the edge of the chassis base on the ground according to the sizes as shown on the Figure 4 1 1 2 3 Drill the holes with 14 and embed M12 anchor screws or expansion screws As...

Страница 5: ...able power When installing the swing barrier turnstile the user only needs to connect it to the corresponding ports Note that the PVC conduits are laid 100mm under the ground with the height of the ex...

Страница 6: ...erly If everything works ne you can tighten the screws and x the device If an exception occurs please contact your vendor 6 It is recommended that a warning line be marked on the ground after installi...

Страница 7: ...DI4 DI3 DI2 DI1 COM SW1 SW2 SW3 SW4 1 3 5 6 4 2 J10 J11 J9 J6 H2 LED LED LED WD0 WD1 GLED BEEP 12V GND 12V GND 485 485 GND GND 24V GND K1 K1 CL 485 485 BEEP GLED WD1 12V WD0 TFT 19 LCD 5V IR2 IR1 IR3...

Страница 8: ...ZKTeco Industrial Park No 32 Industrial Road Tangxia Town Dongguan China Phone 86 769 82109991 Fax 86 755 89602394 www zkteco com...

Отзывы:

Похожие инструкции для SBTL9000 Series