3.2 Cables installation
For the outlet of buried cable, please refer to the locations of the installation holes illustrated in Figure
3-3. The input voltage of this machine is
AC100-120V/200-240V
and its master and slave are
connected with a
6-core connection wire
. When installing this swing barrier turnstile, you only need
to connect it to the corresponding ports. Note that the PVC conduits must be buried
100mm
under
180.00
180.00
600.00
1160.30
100.00
100.00
10
0.0
0
φ
25PVCpip
600.00
600.00
180.00
180.00
180.00
100.00
10
0.0
0
100.00
1940.60
φ
25PVCpip
φ
25PVCpip