![Zitta Caldara 36 Скачать руководство пользователя страница 6](http://html1.mh-extra.com/html/zitta/caldara-36/caldara-36_installation-manual_3843047006.webp)
A
01
A
02
C
é
ramiques
Tiles
24 H
ATTENTION !
Attendre 24h avant d'installer votre
porte de douche, afin de permettre au
mortier et
à
la finition de s
é
cher
compl
è
tement.
WARNING !
Wait 24h before proceeding with the
installa-tion of the shower door. This
will ensure that the finish and mortar
is dry.
20~30mm
Pour prot
é
ger le FINI de
votre base de douche.
To protect your shower
base finish.
(39 1/4"~40 3/4") (997mm~1035mm)
42"
48"
54"
(45 1/4"~46 3/4") (1149mm~1187mm)
(57 1/4"~58 3/4") (1454mm~1492mm)
(33 1/4"~34 3/4") (843mm~881mm)
36"
Protection de la base / Base protection
Dimensions
Vérifier que la base est de niveau / Check that the base is level
6
60"
(51 1/4"~52 3/4") (1302mm~1304mm)
Содержание Caldara 36
Страница 5: ...Round head screw 5...
Страница 9: ...A 07 3 33 1 3 S curiser le panneau xe Fixed panel securing 2 4 9 4 32 4 5...
Страница 23: ...23...
Страница 24: ...81 Theodore Viau Terrebonne Quebec Canada J6Y 0J8...