13
• Place the flood trays on the racks, one on each shelf.
• Orient the tray on the top shelf so that the drain side (low side) of the tray is closest to the left side of
the rack.
• Alternate the remaining two trays so that the drains are at the opposite end of the previous tray, as
shown in Figure 20.
• If assembling the base kit, orient the trays as the top two trays shown in Figure 20.
Figure 20