- CS Commercial HydroTap - Installation Instructions - 09.16 v3.01
Page 11 of 20
Ventilation
A - Kickboard cutout
1.
Drill 4 pilot holes 12mm dia in corners
2.
Finish cutout using a Jigsaw and Keyhole or
Wall board saw
B - Cabinet floor cutout
1.
Drill two pilot holes 12mm dia.
2.
Finish cutout using a Jigsaw
C - Cabinet floor cutout
1.
Drill 4 pilot holes 12mm dia in corners
2.
Finish cutout using a Jigsaw and Keyhole or
Wall board saw
2.3
The following instructions are critical if the vent kit, as supplied,
is not fitted:
If the kick board vent kit cannot be used then it is important to fit a standard HydroTap vent kit, which ensures
heat dissipation through natural convection via installed vents. For high use applications, where the cupboard
space temperature is near 35°C, or higher, an auxiliary ventilation kit must be fitted. (Contact your local
service centre for availability).
Note:
The vent kit has to be installed in a way that allows air to be drawn in from the bottom of the cupboard
and expelled through the top of the cupboard. Therefore placement of the outlet vent should be towards the
top of the door (Option 1) or on the side of the cupboard (Option 2).
Side outlet vent
(
Option 2
)
Door outlet
vent
(Option 1)
Front inlet vent
Cool Air IN
Warm Air OUT
Typical airflow for CS with
no kickboard venting
Warm Air OUT