a) Plumbing

For exposed plumbing connection, connect the cold water inlet pipe from the
base of the heater directly to the 15 mm or half-inch compression fittings with
the nuts and olives provided.

For concealed plumbing connections, connect the cold water pipe through the
rear of the chassis using a 15 mm or half-inch capillary elbow.

Cold water pipes must be flushed before connection to the inlet. Any clogging
due to sediment or fines will adversely affect the operation of the heater.

It is recommended that the heater be installed with a stop cock which allows it
to be isolated from the mains supply for servicing.

Water pressure requirements:

Minimum - 1 bar (100 kPa). Maximum - 7 bar (700 kpa).

Warning: If pressure is likely to exceed 7 bar (700 kpa), a pressure limiting valve
must be installed in the cold water supply line. Zip recommends a valve rated at
3.5 bar (350 kpa) for this application.

b) Venting

A vent at the base of the heater must be plumbed to a safe visible location as,
under certain conditions, it may discharge cold or boiling water and/or steam.

For exposed vent plumbing, connect vent outlet from the base of heater to a 
15 mm or half inch OD pipe which has a continuous fall, is no more than 3
metres long, has no more than 3 right angle bends, and discharges to a waste
water drain.

For concealed vent plumbing, connect plumbing to the vent outlet from the
heater rear using a capillary elbow protruding 45 mm from the wall.

Alternatively attach a tun dish to the wall as shown and plumb away to waste.

c) Electrical

For concealed electrical connection, connect a power cable through the rear
access opening of the heater to the terminal block within the heater as shown.

For exposed electrical connection, connect the flex and plug (fitted to the
heater) to a standard power outlet on the wall within 1500 mm of the heater
that will adequatly cater for the units power needs.

Do not turn the power ON until the heater is filled with water.

Step 4 – Assembling

Place the heater case back on to the heater and secure the top 2 case screws.
Secure two bottom case screws.

Step 5 – Commissioning 

Check previous steps. Turn water supply ON. Water is now flowing into heater,
check connections for leaks. Wait approximately 5 minutes and check outlet
tap for water. This is acheived by pulling the tap handle forward.

Power is only to be turned on when water is available from this outlet.

Turn power ON. After a short period, boiling water will be available and will be
maintained close to boiling point thereafter. Initial heating periods are shown in
the table on the left.

Installation Procedures 

Continued

250mm

Wring

Concealed

Vent

Concealed

Inlet

45 mm

Visible Tundish

Vent line

Inlet water
temperature

15°C

10°C

1.5 Litre models

10 min 11 min

3.0 Litre models

16 min 17 min

5.0 Litre models

16 min 17 min

7.5 Litre models

23 min 24 min

Содержание Hydroboil 01512

Страница 1: ...re White 01511 Zip Hydroboil 1 5 Litre Stainless Steel 03512 Zip Hydroboil 3 Litre White 03511 Zip Hydroboil 3 Litre Stainless Steel 05512 Zip Hydroboil 5 Litre White 05511 Zip Hydroboil 5 Litre Stain...

Страница 2: ...Page 2 of 12 Zip Hydroboil Installation Operating Instructions 81446 February 2005...

Страница 3: ...and relevant local authority by laws Contents Read These Warnings First 4 Installation Requirements 4 Installation Procedures 5 Step 1 Positioning 5 Step 2 Fastening 5 Step 3 Connecting 6 a Plumbing 6...

Страница 4: ...ive cleaners to clean the case of the heater Frost protection If this heater is located where ambient air temperature could fall below 5 C when the heater is not in use do not turn off the appliance e...

Страница 5: ...ap to be not less than 200 mm above the draining board height should be increased only if essential for filling larger vessels Provide clearance for service access of not less than 150 mm top 65 mm le...

Страница 6: ...a waste water drain For concealed vent plumbing connect plumbing to the vent outlet from the heater rear using a capillary elbow protruding 45 mm from the wall Alternatively attach a tun dish to the...

Страница 7: ...3 O L 304 5 0 L 7 5 L 65 CLEAR 56 POSITIONING PIN EXTERNAL PLUMBING ELECTRICAL WIRING POSITION INTERNAL PLUMBING 72 15 25 35 42 COLD INLET VENT BENCH TOP 318 5 O L 416 3 O L 448 5 O L 561 7 5 L 38 1 5...

Страница 8: ...Following remedial service the earthing continuity of the heater must be checked by a qualified technician using an appliance tester or continuity tester of accuracy Class 5 or better Class 5 denotes...

Страница 9: ...oiling water will flow until the tap paddle is released This operation gives fingertip flow control for safe filling of cups and mugs For filtered instant boiling water to fill larger vessels such as...

Страница 10: ...Thermostat Kit 13 90127 Overload kit Hydroboil 2000B 14 90511 Tap Handle Hydroboil HB 15 90510 Outlet Nozzle Hydroboil 2000B 16 90503 Strap and key kit 1 5 3L 2000B 90504 Strap and key kit 5 7 5L 2000...

Страница 11: ...Zip Hydroboil Installation Operating Instructions 81446 February 2005 Page 11 of 12 Spare Parts 1 2 3 4 5 6 9 26 27 24 16 14 11 10 7 25 13 15 1 12 19 8 23 9 1 20 21 17 18 9...

Страница 12: ...st of removal cartage and re installation of any component of the appliance if it needs to be returned for repair to Zip or its Distributor This warranty does not cover damage resulting from non opera...

Отзывы: