Zip ChillTap 804721 Скачать руководство пользователя страница 14

Page 14 of 20 

804721- CS_ChillTap Sparkling 09.16 v1.00

Section 5

Commissioning

Chilled filtered water

(blue)

Sparkling filtered water

(white)

ROTATE

5.1

 - 

Test and Commission:

 

Do NOT turn power or water on to the unit. The carbonator must be purged 
first with the CO2 gas. Failure to do so will result in poor tasting water. Turn the 

sparkling water lever on (white ringed lever) The CO2 will start to run out of the 

tap. Gas will purge or escape from the tap at this point. Let it run for approximately 
5 seconds to completely fill the tank. Close the sparkling lever by rotating back to 
upright. 

Note: Should no CO2 gas be expelled, check if regulator valve is open. 

Turn on the still water lever (blue ringed lever) then turn on the water supply to the 
unit. First air, then water will flow from the tap. Allow the water to continue to flow 
for about 7.5 litres, which is required to activate the filter. Once this has been done 
turn off the still water lever. 

Connect the unit to the mains power supply and turn ON. Confirm the ON/OFF 
switch at the side of the undersink unit is on.

The compressor and fan will start, and the water pump will operate for 
approximately 20 seconds to fill the carbonator vessel.

After approximately 5 minutes, the compressor and fan will stop as the chiller has 
reached its normal operating temperature. 

To achieve an optimal level of carbonation, it is beneficial to purge the carbonation 
vessel again by isolating the water and electrical supply, and opening the sparkling 
lever on the tap until gas is expelled for approximately 5 seconds. Close the tap 
and turn on water and power. Wait 20 seconds and the sparkling water should be 
ready for use. 

Important

: Optimal carbonation levels occur at low water temperatures. 

Excessive flow rates of carbonated water will result in poor drink quality and 
malfunction of system. It is recommended that the flow rate for carbonated water 
should be approximately 1.2-1.6 litres/minute. 

The lever on the right (Blue rings) is used for chilled still filtered water and the lever 
on the left (White rings) is used for chilled sparkling filtered water. 
Chilled water is obtained by rotating the lever on the right, to a horizontal position. 
The water is chilled by a refrigeration unit fitted within the cabinet stand, under the 
basin.

With the carafe tap, you can obtain chilled water within the rated capacity, for as 
long as you leave the lever in the open (horizontal) position. When finished, return 
the lever to the OFF (upright) position.

Sparkling water is obtained in the same way as the chilled water, by rotating the 
lever on the left hand side of the carafe tap. 

FIG.1

FIG.2

Содержание ChillTap 804721

Страница 1: ...Zip ChillTap Sparkling Residential Filtered chilled still and chilled sparkling water Affix Model Number Label Here 804721 804721 09 16 v1 0...

Страница 2: ...ct the gas hose 9 3 4 Test for gas leaks 9 Section 4 Undersink unit installation 10 John Guest J G fittings 10 4 1 Chiller Installation 11 4 2 Hose and Tube connections 11 4 3 Mains Connection 12 4 4...

Страница 3: ...supply connection with isolating valve inside the cupboard is within reach of the braided hoses and positioned so that the connection point and the stop cock will not be obstructed when the undersink...

Страница 4: ...safety For products sold in Europe this appliance can be used by children aged from 8 years and above and persons with reduced physical sensory or mental capabilities or lack of experience and knowled...

Страница 5: ...el and rubber washers from the base of the carafe filler leaving the rubber sealing ring O ring in place Fit the carafe filler and seal to the sink oriented so both the operating levers are easily acc...

Страница 6: ...m door buffers For all installations are fitted to the inside edge of the cupboard door to allow sufficient air circulation inside the cupboard See the diagram below When installing air flow ducts the...

Страница 7: ...se applications where the cupboard space temperature is near 35 C or higher the inlet vent See Item B below and silicon buffers need to be fitted If the airflow is still insufficient to maintain norma...

Страница 8: ...k out and cut the air inlet and door outlet holes as shown 2 Ensure the air inlet vent and air outlet vent are positioned at opposite ends of the same cupboard space 3 Fit the inlet vent as shown and...

Страница 9: ...the gas bottle can stand before securing to the wall Due to regulatory requirements the gas bottle must be stored securely and in an upright position 3 2 Connect the regulator Make sure the regulator...

Страница 10: ...nection The joint will need to be resealed and tested again Clean away the soapy residue and tighten or refit the leaking connection Make sure the regulator is turned off when tightening or refitting...

Страница 11: ...n On Off Switch General instructions for John Guest connections NOTE Ensure all John Guest tube ends are cut clean and square John Guest JG fittings If caps are removed to allow lifting handles to be...

Страница 12: ...braided hose from the isolation valve to the top of the undersink unit marked MAINS IN 4 4 Chilled Still Connection Remove the plug fitted into the connection marked Still Outlet by first depressing t...

Страница 13: ...be running for approximately 1 second before filling your glass or bottle The same is applicable if still water is dispensed prior to dispensing sparkling water Undersink Unit Installation 4 Connect...

Страница 14: ...ely 5 minutes the compressor and fan will stop as the chiller has reached its normal operating temperature To achieve an optimal level of carbonation it is beneficial to purge the carbonation vessel a...

Страница 15: ...flow rate 2 To adjust the flow rate rotate the adjustment screw anti clockwise to increase the flow and clockwise to decrease the flow see FIG 3 Use 1 4 or 1 2 turn increments 3 To measure the flow ra...

Страница 16: ...lter will click or lock into place 5 Turn the still water tap on 6 Turn on the water supply to the unit Allow 7 5 litres to flow from the outlet 7 Turn off the still water lever 8 Turn on the power su...

Страница 17: ...rst and then the power supply 9 Wait 20 seconds and then turn on the sparkling lever and wait for water to start to come through 10 Dispense some sparkling water from the tap Perform a taste test Serv...

Страница 18: ...2 regulator valve is open Replace empty CO2 gas bottle Contact local Zip Service Provider See warm drinks symptom below or allow chilled system time to recover Purge system as described on page 15 Gas...

Страница 19: ...ld be checked regularly at least monthly and dusted or vacuumed Sanitising the Carbonation unit may be required when the quality of sparkling water deteriorates Please contact your local Zip service p...

Страница 20: ...y is one of continuous product improvement changes to specifications may be made without prior notice Images in this booklet have been modified and may not be true representations of the finished good...

Отзывы: