
805194 09.17 1.02
Page 15 of 24
4.1 Install - Light Calibration
From the install menu choose
Continue
and select
Before continuing ensure the unit is in its normal
typical light environment and the front panel is not
covered.
Select
to perform the calibration. It will com-
plete after 6 seconds.
Select
to continue.
4.2 Install - Boiling Calibration
This automatically corrects for boiling point
differences at each installation site. The unit was
calibrated by the installer at installation; however
the installation environment may have changed
requiring recalibration of the boiling point.
Incorrect boiling calibration points may cause
excessive steam vent releases, or increased energy
usage.
From the install menu choose
Continue
and select
The unit will heat the water for boiling calibration.
This may take several minutes depending on the
initial water temperature. When it completes the
screen will automatically return to the install
screen.
4.3 Install - Power Cycle
From the install menu choose
Power Cycle
and select
This will turn the unit briefl y off then on (restart).
All custom settings will be retained.
Choose
Continue
and select
to
perform the power cycle.
Menu Operation