of the store.
For the 3v 24' dome, you will need:
For the 2v 16' dome, you will need:
30 Test Caps
20 Test Caps
15 carriage bolts that are 5” long,
10 carriage bolts 5” long
and 15 nuts and washers for the bolts.
10 nuts and washers for the bolts.
A hole needs to be drilled in the center of each Test Cap slightly larger than the diameter
of the carriage bolt, so that the carriage bolt can be inserted. Assemble the Test Caps
with the carriage bolts inserted.
The Test Caps and carriage bolts will be used on the hubs at the top of the first tier of the
dome. Fold any excess greenhouse covering over the hubs on the top of the first tier to
make a pleat. Insert the carriage bolt through the pleat, and through the center ring of
the hub.
Page 28 of 35
Zip Tie Domes 1857 Brindley Hollow Road, Buffalo Valley, TN 38548 USA