background image

Installation Instructions  |  11

Shipping and Unpacking

The Battery Cabinet comes fully assembled and is shipped in an Air Ride Truck to limit vibrational damage. The cabinet will 

be shipped upright. It can be shipped with or without a pallet.

CAUTION: 

The Cabinet has a high center of gravity (36.25”) – use caution when moving.

Upon arrival follow these steps:
1. Inspect the outside of the cabinet for damage prior to signing for release.

 

Visible Damage

• 

It is the responsibility of the person receiving the shipment to 

inventory and fully inspect all materials against the bill of lading 

or weigh bill IMMEDIATELY while the carrier representative is still 

present. Ensure that all items are accounted for, including number of 

skids and quantity of boxes. Also note any visible external damage 

that may have occurred during transit. Make all applicable notations 

on the delivery receipt before signing and file a damage report with 

the carrier.

• 

Examine the TILT and SHOCK sensor on the cabinet. Both are just 

notifications to show the unit may have been exposed to excessive 

forces and that inspection is required to ensure no damage was 

done. Units received should be accepted from the shipper, but the 

activation must be noted with the shipper at time of acceptance.  

2. Remove foam wrap, protectors, and clear plastic over the battery cabinet. 

3. There are NO strap downs on the batteries. Everything will remain secure in place. 

4. Perform a visual inspection of the cabinet. 

a. Open the door and examine all the batteries/drawers to make sure

everything is still secure and attached. Note: Drawers are locked in place with two bolts and will not pull out 

without those being removed.

b. Check torque seal markers on batteries

c. Concealed Damage

• 

Immediately unpack the system and check for any concealed damage. Check the materials received against 

the detailed packing list to verify the quantity and the condition as complete and satisfactory.

• 

Note observations of any liquid or crystallized elecotrolyte on the sides of the batteries.

d.  Return of Damaged Goods

• 

For product returns, please contact a ZincFive support representative to obtain a return material 

authorization (RMA).

5. Save the packaging material in the event a return is needed. ZincFive does not warranty product damage from return 

shipping unless it is shipped in approved packaging. Carefully move the cabinet to the install location using necessary fork 

lift / pallet jack

a. Spread forks as wide as possible when lifting.

b. Keep as low as possible to keep center of gravity as low as possible.

c. Lower kick-plate is zip tied inside cabinet, install once cabinet has been moved and secured to the floor.

d. The cabinet has been designed to be movable while fully loaded with batteries.

NOTES: 

 

• 

DO NOT LIFT from the control box as it will not support the frame weight.  

Cabinet may only be lifted from the bottom of the frame.

• 

Refer to Appendix A for additional moving details.

Figure 1. Palletized Battery  

Cabinet Packaging

ZincFive, Inc.

20170 SW 112th Ave.

Tualatin, Oregon 97062

Содержание BC Series

Страница 1: ...Installation Instructions ZincFive BC Series UPS Battery Cabinets Copyright 2022 ZincFive Inc All rights reserved ZincFive BC Series UPS Battery Cabinet...

Страница 2: ...Copyright 2022 ZincFive Inc All rights reserved...

Страница 3: ...Manual 5 Save this Manual 5 Disclaimer Safety 6 Safety Symbols 7 Battery Safety 8 Battery Warnings and Cautions Specifications Safety Precautions Tools Pr cautions de s curit Outils Shipping and Unpac...

Страница 4: ...product returns please contact a ZincFive support representative to obtain a return material authorization RMA ZincFive Inc 20170 SW 112th Ave Tualatin Oregon 97062 Customer is responsible to properly...

Страница 5: ...ort representative visit zincfive com support or call 888 517 7776 Disclaimer While efforts have been made to ensure the accuracy and validity of information contained in the document ZincFive assumes...

Страница 6: ...AND BATTERIES FAILURE TO HEED THESE INSTRUCTIONS AND WARNINGS WILL VOID YOUR WARRANTY CAUTION Important information or operating instructions Follow them exactly Protective Earth Ground Symbol Used t...

Страница 7: ...sulated handles c Wear rubber gloves and boots d Do not lay tools or metal parts on top of batteries e Disconnect charging source and load prior to installing or maintaining the battery f Remove batte...

Страница 8: ...75 C OR INCINERATE French PROT GER LES YEUX EN TOUT TEMPS AVEC UN QUIPEMENT DE PROTECTION PAS D TINCELLES OU DE FLAMMES INTERDICTION DE FUMER LECTROLYTES ALCALINS RINCER LES YEUX IMM DIATEMENT AVEC DE...

Страница 9: ...n SOC with extended storage the batteries must not be stored more than six months without recharging If attached to a UPS that remains de energized for a long period ZincFive recommends you energize t...

Страница 10: ...sage de longue dur e il ne faut pas entreposer les batteries plus de six mois sans les recharger Si reli une ASI qui reste inerte pendant une p riode prolong e ZincFive vous recommande d alimenter l A...

Страница 11: ...place 4 Perform a visual inspection of the cabinet a Open the door and examine all the batteries drawers to make sure everything is still secure and attached Note Drawers are locked in place with two...

Страница 12: ...cluding eye protection The cabinet voltage will exceed 500V between some of the batteries components 1 Inspection of the Batteries installed a Visual inspection of battery strings cables Confirm nothi...

Страница 13: ...nductors to the circuit breaker a Make sure all power is off before making connection b Positive conductor s will be attached to Terminal 4 Bottom of circuit breaker c Negative conductor s will be att...

Страница 14: ...orque screws to 0 6 0 8Nm 5 31 7 08 in lb c Note The AC power MUST be supplied by a 100Watt UPS backed circuit This powers the BMS and must remain powered when in backup during a power outage for the...

Страница 15: ...nfigured with an UVR access the circuit breaker cannot be turned on until UPS outputs its rated UVR voltage When the battery cabinet is configured with a shunt access the circuit breaker will trip whe...

Страница 16: ...stem is online https manage anzenbms com c The system will begin in Pre standby state until DC Power is applied d Confirm all batteries are within 0 3V of one another Since all batteries ship between...

Страница 17: ...Installation Instructions 17 Appendix A...

Страница 18: ...18 Installation Instructions Appendix B...

Страница 19: ...Installation Instructions 19 Appendix C...

Страница 20: ...20 Installation Instructions Notes...

Страница 21: ...Copyright 2022 ZincFive Inc All rights reserved...

Страница 22: ...ZincFive Inc 20170 SW 112th Ave Tualatin Oregon 97062 zincfive com support 01100 00400 00100 rev H00 Copyright 2022 ZincFive Inc All rights reserved...

Отзывы: