background image

Z8 Encore!

®

 Z8F642 MCU 

Evaluation Kit Quick Start Guide

Page 5

QS002802-0703

Getting Started Using ZDS II

7. When the installation is complete, a reminder screen appears asking you to register the 

product online at www.zilog.com. To register at a later time the registration link to the 
internet site is found in the ZDS II Help menu.

8. The following directory is installed on the host PC, assuming all installation settings 

remain at their defaults:

 

C:/Program Files/ZiLOG/ZDSII_<product>_<version number>.

Getting Started Using ZDS II

Perform the following procedure to open an existing project.

1. Connect the Evaluation board to the host PC’s serial communications port using the 

Smart Cable.

2. Apply power to the Evaluation board. 

3. Run the ZDS II Software (

Start

 > 

Programs

 > 

ZDS

 

II

_

<product>_<version 

number>ZDS II <product><version number>.

 

4. Select 

Open Project 

from the 

File

 menu. The 

Open Project

 dialog box appears. See 

Figure 3 (example only).

Figure 3. Open Project Dialog Box 

5. Browse to the samples directory:

 

c:

\

Program Files

\

ZiLOG

\

ZDSII_<product>_<version number>

\

Sam-

ples

\.Select 

samples

. The samples folder appears (Figure 4).

Downloaded from 

Elcodis.com

 

electronic components distributor

 

Содержание Z8 Encore!

Страница 1: ...to Z8 Encore evaluation board DB9 to six pin male Universal power supply Software on CD ROM ZDS II Encore IDE with ANSI C Compiler Sample code Acrobat Reader install program Document browser Document...

Страница 2: ...ro static discharge ESD 1 Connect the serial port of the PC to the Z8 Encore Smart Cable DB 9 female connector 2 Connect the Z8 Encore Smart Cable to the Z8F642 MCU evaluation board pin header P2 3 Co...

Страница 3: ...Hewlett Packard socket on the other end to the Hewlett Packard power cord receptacle at the plug end of the power supply 2 Plug the power supply into an electrical outlet Installing the ZDS II Z8 Enc...

Страница 4: ...tallation The License Agreement appears 3 Select Yes to accept the agreement and proceed with the installation 4 After selecting Yes the Choose Destination Location screen appears Follow the direction...

Страница 5: ...sion number Getting Started Using ZDS II Perform the following procedure to open an existing project 1 Connect the Evaluation board to the host PC s serial communications port using the Smart Cable 2...

Страница 6: ...rectory 6 Select the Z8F64xx_ledBlink folder and then the src folder to access the project file containing ledBlink pro Figure 5 Figure 5 src Folder 7 Select the ledblink pro file and click open The i...

Страница 7: ...k on the Rebuild All icon to build the project Wait for the build to complete 9 Click on the Reset icon to connect and download the code to the Evaluation board 10 Click on Go to start the program The...

Страница 8: ...703 Page 8 Figure 7 ZDS II Active Screen 11 Press the test push button to change the sequence of the LEDs to blink in the opposite direction The three LEDs begin blinking in sequence If the LEDs do no...

Страница 9: ...ed to suggest possible uses and may be superseded ZiLOG INC DOES NOT ASSUME LIABILITY FOR OR PROVIDE A REPRESENTATION OF ACCURACY OF THE INFORMATION DEVICES OR TECHNOLOGY DESCRIBED IN THIS DOCUMENT Zi...

Отзывы: