User Manual
UM015201-0603
Peripheral Bus Connector
ZiLOG Development Platforms
eZ80
®
Sales Demonstration Platform
8
6. The Settings dialog appears. Select the Debugger tab. In the Debugger tab,
click on the Configure ZPAK II button.
7. The Configure ZPAK II dialog box appears. In the IP Address field, a default IP
address, 192.168.1.50, is displayed and highlighted. Enter the ZPAK II IP
address you configured during hardware install. (Either the default of
192.168.1.50 or the IP address to which you set the ZPAK II.) Leave the other
settings as they are.
8. Click OK in the Configure ZPAK II dialog, and then click OK in the Project Set-
tings dialog.
9. Select
Build
→
Rebuild All
. Wait for the build to complete (Status panel indi-
cates Build Complete).
10. Download the demo into the eZ80® Sales Demonstration Platform by select-
ing
Build
→
Debug
→
Reset
.
11. To run the demo, select
Build
→
Debug
→
Go
.
12. When the demo software runs, the demonstration platform LCD screen dis-
plays ez80L92 and eZ80L92 module features, then displays the time and
date.
13. Select
Build
→
Debug
→
Stop Debugging
to stop the demo.
Peripheral Bus Connector
Figure 5 illustrates the 60-pin peripheral bus connector, JP1. Table 2 describes
the pins and their functions. (Pin 50 on the eZ80L92 module connectors line up
with pin 60 on the eZ80
®
Sales Demonstration Platform board connectors. The
connector is keyed to help orient the board.) Refer to the module product specifi-
cation on the demonstration platform CD for pin functions and locations.