background image

Zig-Zag 

Message Center

Assembly 

Instructions

Model# KMC3500

Содержание KMC3500

Страница 1: ...Zig Zag Message Center Assembly Instructions Model KMC3500 ...

Страница 2: ... included 2 Large Vertical Double Message Center AMC A0004 1 Middle Large Vertical Double Message Center AMC A0008 2 Large Vertical Roof AMC A0009 1 Middle Large Vertical Roof AMC A0010 2 Inground Post Assembly AMC A0006 2 Inground Outer Post AMC P0016 ...

Страница 3: ... 3 50 Lag Screw 16 3 8 Flat Washer 4 3 8 x 5 00 Hex Head Bolt 12 3 8 x 6 50 Hex Head Bolt Before assembly please make sure all hardware is included Power drill Screw gun 7 16 Socket 9 16 Socket Level Guide wires Wood for bracing Post hole filler ...

Страница 4: ...illustration Attach the Inground Post Assemblies to the Middle Large Vertical Double Message Center as shown Be sure to properly orientate posts as indicated Place posts into post holes leveling where necessary Fill post holes with filler Before Step 1 can be completed two holes must be dug 41 apart on center at a depth of 30 36 Make each hole approximately 10 wide in diameter These holes will be ...

Страница 5: ...rtical Double Message Center Hardware required for Step 2 2 3 8 x 5 00 Hex Head Bolt 2 3 8 Flat Washer Step 2 Lay out the required components as shown in the illustration Attach the Inground Outer Post to the Large Vertical Double Message Center as shown using the indicated hardware Repeat step for second Large Vertical Double Message Center ...

Страница 6: ...tion of the Zig Zag Message Center Refer to hole layout at end of instructions for more detail Step 3 Place End Section of Zig Zag Message Center into post hole and attach to Middle Section of Zig Zag Message Center as shown Use the supplied 3 8 x 6 50 Hex Head Bolt Level where necessary and fill hole with filler Repeat step for second end section Components required for Step 3 Hardware required f...

Страница 7: ...rtical Roof Hardware required for Step 4 6 1 4 20 x 3 50 Lag Screw 6 1 4 Flat Washer Step 4 Attach Large Vertical Roof to Large Vertical Double Message Center as shown Secure Roof using the supplied 1 4 20 x 3 50 Lag Screw Note that the other Roof hole is located on opposite side of message center Repeat step for each section of the Zig Zag Message Center ...

Страница 8: ...41 000 40 000 40 000 57 280 REFERENCE MEASUREMENT STEP 2 STEP 1 STEP 2 DIG HOLES 10 WIDE AT A DEPTH OF 30 36 00 Post Hole Layout ...

Отзывы: