Figure 8-19
Figure 8-20
Brake wiring diagram with micro switch
Figure 8-21
1 Brake release monitoring
2 Brake
3 Shown with currentless brake
Brake wiring diagram with inductive proximity
switch
Figure 8-22
1 Brake release monitoring
2 Brake
3 Minimum strength 2 mA DC
4 Operating voltage range 10 - 30 V DC
5 Shown with currentless brake
39. Lead the connection cables (6) of the magnet coils and the release monitoring into the terminal
box.
40. Connect the solenoids, release monitoring and varistors (5) as shown in the wiring diagram (see
Figure 8-21 and Figure 8-22) inside the cover of the junction box (1).
41. Fit strain reliefs (4).
Figure 8-23
42. Close the cover (1) of the junction box.
43. Screw on the cover (1) with the 4 cylinder head screws M5 x 10 - 8.8 (2) with a torque wrench for
tightening torque 5.5 Nm with a size 4 socket head wrench.
Tightening torque: 5.5 Nm
44. Perform brake test (see chapter "Brake operating instructions - brake test" in the appendix at the
original operating instructions).
45. Carry out the alignment of the absolute encoder (8) corresponding to the original operation
instructions of the frequency inverter.
Assembly instructions
–
model series ZAtop
Mounting the brake
A-TIA20_10-GB 2027 Index 002
Part.-No. 01013487-GB
14/16