11
1. Disconnect the test leads from the meter.
2. Remove the protective rubber holster.
3.
Remove the battery cover (two “B” screws) and the
battery.
4.
Remove the four “A” screws securing the rear cover.
5. Lift the center circuit board straight up from the
connectors to gain access to the fuse holders.
6. Gently remove the old fuse and install the new fuse into
the holder.
7. Always use a fuse of the proper size and value
(0.2A/250V fast blow for the 200mA range).
8.
Align the center board with the connectors and gently
press into place.
9.
Replace and secure the rear cover, battery and battery
cover.
Multi-Network Modular Cable Tester Operation
Note:
Make sure the battery power is sufficient. Insufficient
battery power will lead to dimmed LEDs and incorrect
results.
10 Base-T Test
1. Plug one end of the tested cable into the transmitting RJ45
jack on the master unit marked with a '
回
' and the other
end of the cable into the remaining receiving RJ45 jack.
2. Slide power switch on. The upper row of LEDs will start to
scan in sequence if the Auto/Manual button is set on
"Auto" mode. The LED for pin 1 will light up if the button is
in "Manual" mode.
3. Switch back and forth from Auto or Manual scanning mode
by pressing the Auto/Manual button on the side of the