background image

×293×140mm

Main                435

 

 

10 

 

10 

20 

30 

40 

50 

60 

70 

80 

90 

100 

110 

120 

Ω  1000  1039  1077  1116  1155  1194  1232  1270  1309  1347  1385  1422  1460 

NTC 10K B=3950 resistance value 

 

10 

20 

30 

40 

50 

60 

70 

80 

90 

100 

110 

120 

Ω  33620  20174  12535  8037  5301  3588  2486  1759  1270  933  697 

529 

407 

. Packing list 

 

No. 

Name 

Specification 

Quantity 

 

1   

PT1000 sensor 

15m 

NTC sensor 

3m 

4   

Power wire 

1.5

 

1   

Aux.H wire 

1.5

 

1   

Output wire 

0.5

                     3   

                       

Filling valve 

3/4 

1   

Screws 

                          4   

Manual 

 

1   

 

Solar working station series for solar water heating control system

Содержание SP228

Страница 1: ......

Страница 2: ...solar station against overloading and short circuiting All devices connected to the work station must conform to the technical specifications of the device As soon as it becomes evident that safe oper...

Страница 3: ...sistance 72 solar hot water systems Operate with fingertip or touch control pen With high sense and stably Check valve Prevent medium flow back Flow sensor Measure flow rate used in Calorimetry functi...

Страница 4: ...it means the medium has been filled up Then close the button and open the button System diagram 72 solar hot water system System 1 System 2 System 3 System 4 System 5 System 6 System 7 System 8 System...

Страница 5: ...stem 34 System 35 System 36 System 37 System 38 System 39 System 40 System 41 System 42 System43 System 44 System 45 System 46 System 47 System 48 System 49 System 50 System 51 System 52 System 53 Sys...

Страница 6: ...61 System 62 System 63 System 64 System 65 System 66 System 67 System 68 System 69 System 70 System 71 System 72 Please look view the detail system description on operation board Solar working statio...

Страница 7: ...stem Temp difference circulate Set switch on and switch off temp difference Pump speed adjustment Set Pump speed Aux H Set auxiliary heater temp and time periods Solar heat collecting Set heat collect...

Страница 8: ...llector frost protection 3 2 8 When the collector temp is lower than the desired frost protection temp this function will be activated Tank high temp protection 80 50 95 When the storage reaches the d...

Страница 9: ...measuring the temp T6 T7 and flow rate of medium transfer them to heat amount through the formula Q CM t Take system 1 as example The temp sensor T7 andflow sensor have been installed inside the work...

Страница 10: ...n t work Temperature sensor has broken circuit or short circuit Check sensor connection and make the wiring again Auxiliary heater still operates at 23 00 Anti bacteria function starts up It s normal...

Страница 11: ...0 10 20 30 40 50 60 70 80 90 100 110 120 33620 20174 12535 8037 5301 3588 2486 1759 1270 933 697 529 407 Packing list No Name Specification Quantity 1 2 PT1000 sensor 15m 2 3 NTC sensor 3m 4 4 Power...

Отзывы: