Zeversolar Zeverlution S Скачать руководство пользователя страница 7

 

Power_Management_1_Phase_Inv_Rev1_20160426 

 

1.

 

Navigate  to  the  “Normal”  screen  by 
pressing the control button on the front 

panel. 

 

2.

 

When the “Normal” screen is displayed, 

press  and  hold  the  control  button  for 

approximately 10 seconds.  

 

3.

 

To deactivate the Power Management & 

EEG  setting,  press  the  control  button 
repeatedly  until  “ActiveP&EEG : OFF”  is 

displayed. To confirm the setting simply 

release the control button and wait until 
the “Normal” screen is displayed. 

 

4.

 

To  activate  the  Power  Management, 

press  the  control  button  until 
“ActiPowFun:  ON”  is  displayed.  To 

confirm  the  setting  simply  release  the 

control  button  and  wait  until  the 
“Normal” screen is displayed. 

 

5.

 

To  activate  the  EEG  setting,  press  the 

control  button  until  “EEG  :  ON”  is 
displayed. To confirm the setting simply 

release the control button and wait until 

the “Normal” screen is displayed. 

 

Table 4 - Power Management & EEG Set-Up 

 

 

Содержание Zeverlution S

Страница 1: ...Zeverlution S Evershine TL Eversol TL Power Management EEG Setup Guide...

Страница 2: ...r Power Management EEG Setup Guide Zeversolar Contact Details Karlos Silva Technical Sales Manager Europe Address Luxemburger Str 59 50674 Cologne Germany Email Karlos silva zeversolar net Phone 49 22...

Страница 3: ...3 IMPORTANT CHECK GRID CODE SETTING DURING COMMISSIONING 3 1 4 When is Power Management EEG Required 4 1 4 1 Power Management 4 1 4 2 EEG 70 4 1 5 Hardware Requirements 5 1 6 Software Requirements 5...

Страница 4: ...IMPORTANT CHECK GRID CODE SETTING DURING COMMISSIONING The grid code power management and EEG settings should be checked during the commissioning of a PV plant It is essential to ensure that the corr...

Страница 5: ...r of according to a defined characteristic curve which is a function of U Un Active Power Limitation The PV plant will limit the active power based on either the rated inverter AC output rated DC arra...

Страница 6: ...activating Activating 1 7 1 Checking Firmware Version It is necessary to ensure that the inverter has the appropriate firmware version For older firmware versions it is not necessary to deactivate or...

Страница 7: ...F is displayed To confirm the setting simply release the control button and wait until the Normal screen is displayed 4 To activate the Power Management press the control button until ActiPowFun ON is...

Страница 8: ...ent_1_Phase_Inv_Rev1_20160426 7 1 8 Zeversolar Contact Details Karlos Silva Technical Sales Manager Europe Address Luxemburger Str 59 50674 Cologne Germany Email Karlos silva zeversolar net Phone 49 2...

Отзывы: