STANDARD OPERATING PROCEDURE
String Inverter Installation – Zeverlution Series
Version 1.2 Effective date 02/08/2017
Page 2 of 15
PURPOSE
This document provides all solarcity installation partners and employees with guidelines and instructions
for the installation of single and dual MPPT inverters for residential solarZero and solarClassic systems.
SCOPE
This document applies to single-phase installations with Zeversolar string inverters and covers the
mechanical and electrical part of the inverter installation instruction. The focus of this SOP lies on the
physical installation of Zeverlution 2000s and Zeverlution 4000 inverters and any associated switch gear,
DC and AC wiring.
SYMBOLS USED IN THIS DOCUMENT
Danger: destruction of property, serious injury or death may occur
Warning: Damage to equipment/ property or minor injury may occur
Note: for informational purposes
Reference to other section in this document, or an external document.
GENERAL GUIDELINES
BEHAVIOURAL
Always follow solarcity’s Code of Conduct while on site.
SAFETY
Follow NZ Health & Safety laws and regulations, your company’s and/or solarcity’s Health & Safety
Policy.