PURPOSE 

This document provides all solarcity installation partners and employees with guidelines and instructions 
for the installation of single and dual MPPT inverters for residential solarZero and solarClassic systems.  
 

 

SCOPE 

This document applies to single-phase installations with Zeversolar string inverters and covers the 
mechanical and electrical part of the inverter installation instruction. The focus of this SOP lies on the 
physical installation of Zeverlution 2000s and Zeverlution 4000 inverters and any associated switch gear, 
DC and AC wiring. 
 

 

SYMBOLS USED IN THIS DOCUMENT 

 

 

Danger: destruction of property, serious injury or death may occur 

 

Warning: Damage to equipment/ property or minor injury may occur 

 

Note: for informational purposes 

 

Reference to other section in this document, or an external document. 

 

 

GENERAL GUIDELINES 

 

BEHAVIOURAL 

 

Always follow solarcity’s Code of Conduct while on site. 

 

 

SAFETY 

 

Follow NZ Health & Safety laws and regulations, your company’s and/or solarcity’s Health & Safety 
Policy. 

 

 
 

 
 
 
 
 
 

Содержание Zeverlution 2000S

Страница 1: ...2 BEHAVIOURAL 2 SAFETY 2 INSTALLATION PROCEDURE 3 String Design Guidelines 3 5 1 1 String Layout Without Optimisers 3 5 1 2 String Layout with Optimisers 3 5 1 3 Shading 3 5 1 4 Maximum String Voltage...

Страница 2: ...d electrical part of the inverter installation instruction The focus of this SOP lies on the physical installation of Zeverlution 2000s and Zeverlution 4000 inverters and any associated switch gear DC...

Страница 3: ...4000 inverters and for arrays with or without optimisers the minimum and maximum strings lengths are as follows minimum number of modules per string is 3 maximum number of modules per string is 10 5 1...

Страница 4: ...systems with a peak output between 1 5kWp and 3kWp 6 to 10 modules where the peak performance rating per panel at STC does not exceed 295Wp For further details please refer to the Zeverlution 2000s da...

Страница 5: ...et which is used to fix the units to a suitable wall Please refer to the solarcity wall cladding guide for suitable wall claddings to mount the inverter on 1 Use the wall bracket as a drilling templat...

Страница 6: ...ble The inverter must not be installed in a location where it is exposed to direct sunlight Wiring 5 3 1 DC Wiring All wiring must be installed and sized in accordance with the relevant requirements o...

Страница 7: ...ted as per AS5033 The table below shows the maximum cable length one way between array and inverter with JA 290W panels allowing for a 2 voltage drop Panels per string 3 4 5 6 7 8 9 10 Max cable lengt...

Страница 8: ...to maintain the correct polarity the connectors are also marked with and symbols The steps below explain how to assemble SUNCLIX connectors Ensure that the array cable is de energized before installin...

Страница 9: ...lled on an appropriate roof penetration kit must be used Roof penetrations must always be located under the solar panels where an attic space is accessible for the cable run Where cable s pass through...

Страница 10: ...mm which is usually too short for leapfrog wiring Please use standard daisy chain wiring for all optimised array sections 5 3 3 AC Wiring The inverter is connected to the switchboard using double insu...

Страница 11: ...S 5033 2014 and follow the instructions outlined in the standard Attached to this document you ll find a commissioning sheet which you may use to record the test results A completed and signed copy of...

Страница 12: ...To confirm wait for approximately 10 seconds until the inverter automatically returns to the initial display showing the error code Connecting the inverter to the Internet The inverter needs to be co...

Страница 13: ...before setting up the WIFI connection 2 With the inverter powered up use a smartphone or laptop to search for the inverter s wireless access point This will display as ZEVERSOLAR XXXX Connect to this...

Страница 14: ...omer s wireless network 6 After approximately one minute the inverter should connect to the customers wifi network and the status indicator on the wireless page will show a green tick 7 Take a photo o...

Страница 15: ...rnet cable through the comms gland on the bottom of the inverter ensuring that the cable entry is sealed from dust and moisture 3 The inverter automatically obtains an IP address from the router via D...

Страница 16: ...rod MEN link removed Earth continuity 2 Main earth conductor to array frame Polarity check and PV open circuit voltage Polarity Voltage V String 1 String 2 if applicable PV array at switch disconnect...