background image

Please take a few moments to check all pack contents listed.  

Please contact “Zest4Leisure” directly if any of the pack contents are damaged 

or missing. Contact telephone: 01352 752555 option 1

 

or email: 

[email protected] 

Assembly requires 2 persons. All screw holes to be pre-drilled. 

Tools required: Corded/Cordless Drill, Pozi-drive Bit/Screwdriver, 3mm Drill Bit, 

Tape Measure. 

Twilight Arch is now complete. 

1.

Position Rafters B at both ends of Arches A and fix using 4no 60mm Screws - 2 
per Rafter (Fig.1a). Space out remaining Rafters B equally (Fig.1b) and attach 
using 6no 60mm Screws. 

 

2.

Locate Post C onto Arch A as shown in Fig.2a (adjust width to suit). Fix in position 
using 2no 60mm Screws (Fig.2b). 

 

3.

Place Trellis Panel D 400mm from base of Post C and fix in position using 2no 
40mm Screws (Figs.3a & 3b). 

 

4.

Position second Post C as shown in Fig.4a and fix to Arch A using 2no 60mm 
Screws.  

 

Fix Trellis Panel D to second Post C using 2no 40mm Screws (Figs.4b & 4c). 

 

Repeat stages 1-4 for remaining Posts & Trellis Panel on opposite side of arch. 

 

5.

Ensuring Post C is perpendicular to Rail A, place Bracing E as shown in Fig.5 and 
fix in position using 2no 60mm Screws.  

 

Repeat procedure for remaining bracings.  

 

 