Please take a few moments to check all pack contents listed.
Please contact “Zest4Leisure” directly if any of the pack contents are damaged
or missing. Contact telephone: 01352 752555 option 1
or email:
Assembly requires 2 persons. All screw holes to be pre-drilled.
Tools required: Corded/Cordless Drill, Pozi-drive Bit/Screwdriver, 3mm Drill Bit,
Tape Measure.
Twilight Arch is now complete.
1.
Position Rafters B at both ends of Arches A and fix using 4no 60mm Screws - 2
per Rafter (Fig.1a). Space out remaining Rafters B equally (Fig.1b) and attach
using 6no 60mm Screws.
2.
Locate Post C onto Arch A as shown in Fig.2a (adjust width to suit). Fix in position
using 2no 60mm Screws (Fig.2b).
3.
Place Trellis Panel D 400mm from base of Post C and fix in position using 2no
40mm Screws (Figs.3a & 3b).
4.
Position second Post C as shown in Fig.4a and fix to Arch A using 2no 60mm
Screws.
Fix Trellis Panel D to second Post C using 2no 40mm Screws (Figs.4b & 4c).
Repeat stages 1-4 for remaining Posts & Trellis Panel on opposite side of arch.
5.
Ensuring Post C is perpendicular to Rail A, place Bracing E as shown in Fig.5 and
fix in position using 2no 60mm Screws.
Repeat procedure for remaining bracings.
Содержание Twilight Arch
Страница 4: ...www zest4leisure co uk 1b 1a 2a 2b 3a 3b ...
Страница 5: ...www zest4leisure co uk 5 4c 4a 4b ...