
www.zest4leisure.co.uk | 01352 752555 option 1 | [email protected]
Requires 2 person assembly.
Please take a few moments to check all pack contents listed.
Tools required: Corded / Cordless Drill, Pozi-drive Bit / Tape measure / Screwdriver, 3mm
Drill Bit required in order for you to drill all screw holes before construction.
The colour version of this document can be downloaded from: www.zest4leisure.co.uk/
downloads/category/C1
1. Position 2 no rafters A, one at each end of rail B, and fix using 4 no 80mm screws. (Fig 1a) Position 2 fur-
ther rafters A on rail B, 230 mm in from the first 2 rafters, and fix with 4 no 80 mm screws. (Fib 1b) Finally,
position the remaining rafter A centrally on rail B, and fix using 4 no 80mm screws (Fig 1c)
2. Position 1no Trellis Panel C between 2no Posts D ensuring trellis is 300mm from top of post and notches
are outer facing. Fix using 6no 60mm screws - 3no per post (Fig. 2). Repeat procedure with remaining
Trellis Panel C and Posts D.
3. Locate Rafters A onto Post/Trellis Assemblies and fix in position using 8no 80mm Screws – 2no per
post (Fig.3).
4. Attach Braces D as shown in Fig.4 using 8no 80mm Screws – 2no per Brace D.