background image

Please take a few moments to check all pack contents listed. 

Assembly requires 2 persons. 

Tools required: Adjustable Spanner, Corded/Cordless Drill, Pozi-drive 

Bit/Screwdriver, 3mm Drill Bit required in order for you to drill all screw holes 

before construction.

Veg Bed 2m is now complete.

1. Fix End Panels A to Base Board B using 4no 60mm Screws 

– 2no per End Panel A 

(Figs.1a & 1b)

2. Position Side Panel C between End Panels A (Fig.2a) and attach using 8no 60mm 

Screws 

– 4no through each End Panel A – Fig.2b.

Repeat procedure for remaining Side Panel C. 

3. Position Side Board D between End Panels A , on top of Side Panel C (Fig.3a) and 

attach using 6no 60mm Screws 

– 2no through each End Panel A (Fig.3b) and 2no 

through Side Panel C (Fig.3c).
Repeat procedure for remaining Side Board D.

4. Interlock 2no Legs E and fix together using 1no 65mm Bolt, Washer & Nut (Fig.4a).

Repeat procedure for remaining Legs E. 
Position 2no legs assembly 12cm nom. from End Panels A and 1no leg assembly 
centrally (Figs.4b & 4c) and fix through Side Panels C using 18no 60mm Screws 

3no per Leg E (Figs 4d & 4e). 

Отзывы: