background image

Please take a few moments to check all pack contents listed.  

Please contact “Zest4Leisure” directly if any of the pack contents are damaged 

or missing. Contact telephone: 01352 752555 option 1

 

or email: 

[email protected] 

Assembly requires 2 persons. All screw holes to be pre-drilled. 

Tools required: Corded/Cordless Drill, Pozi-drive Bit/Screwdriver, 3mm Drill Bit, 

Tape Measure. 

Sunset Arch is now complete. 

1.

Position Rafters B at both ends of Rails A and fix using 4no 60mm Screws 

– 2no 

per Rafter (Fig.1a). Space out remaining Rafters B equally (Fig.1b) and attach 
using 6no 60mm Screws. 

 

2.

Locate Post/Trellis Assembly C onto Rails A as shown in Fig.2a (adjust width to 
suit). Fix in position using 2no 60mm Screws 

– 1no per side (Fig.2b). 

 

Repeat procedure for remaining Post/Trellis Assembly. 

 

3. 

Ensuring Post/Trellis Assembly  C is perpendicular to Rails A, position Bracings D 
as shown in Figs.3a & 3b and fix using 4no 50mm Screws 

– 2no per bracing.  

 

Repeat procedure for remaining bracings.  

 

 

Отзывы: