Please take a few moments to check all pack contents listed.
Please contact “Zest4Leisure” directly if any of the pack contents are damaged
or missing. Contact telephone: 01352 752555 option 1
or email:
Assembly requires 2 persons. All screw holes to be pre-drilled.
Tools required: Corded/Cordless Drill, Pozi-drive Bit/Screwdriver, 3mm Drill Bit,
Tape Measure.
Moonlight Arch is now complete.
1.
Position Rafters B at both ends of Arches A and fix using 4no 60mm Screws - 2
per Rafter (Fig.1a). Space out remaining Rafters B equally (Fig.1b) and attach
using 6no 60mm Screws.
2.
Position Post C onto Arch A as shown in Fig.2a (adjust width to suit). Fix in
position using 2no 60mm Screws (Fig.2b).
3.
Place Trellis Panel D 400mm from base of Post C and fix in position using 2no
40mm Screws (Fig.3a & 3b).
4.
Position second Post C as shown in Fig.4a and fix to Arch A using 2no 60mm
Screws.
Fix Trellis Panel D to second Post C using 2no 40mm Screws (Fig.4b)
Repeat stages 1 to 4 for remaining Posts & Trellis Panel on opposite side of arch.