background image

Please take a few moments to check all pack contents listed on page 1 of the 
Assembly Instructions. 

Please contact “Zest4Leisure” directly if any of the pack contents are damaged 
or missing. Contact telephone: 01352 752555 option 1 or email: 
[email protected] 

Assembly requires 2 persons. All screw holes to be pre-drilled. 

Tools required: Corded/Cordless Drill, Pozidrive Bit/Screwdriver, 3mm Drill Bit. 

The Deep Root Planter 1m is now complete. 

1.

   Attach one End Panel (A) to Side Panels (B) using 6no 45mm screws per End 

Panel, as shown in Figs 1a & 1b. Repeat process with the second End Panel (A) 
as shown in Fig 1c.

 

Position screws as shown in Fig 1d. 

 
 
 

2.

   Attach Base Board Support Rails (C) to base of Side Panels using 8no 35mm 

screws (4no per side) as shown in Figs 2a & 2b. 

 

 

3.

   Loose fit ALL base boards (D) as shown in Figs 3a & 3b. A minimum of three 

central boards to be screwed down to Base Board Support Rails using 6no 45mm 
screws.  

 

 

4.

   Set out the 4no Capping Trims (E) on top of the planter and attach using the 12no 

45mm screws (3no screws per trim) as shown in Figs 4a & 4b.  

Отзывы: