
Please take a few moments to check all pack contents listed.
Please contact “Zest4Leisure” directly if any of the pack contents are damaged
or missing. Contact telephone: 01352 752 555 Option 1 or email:
[email protected]
Assembly requires 2 persons. All screw holes to be pre-drilled.
Tools required: Corded/Cordless Drill, Pozidrive Bit/Screwdriver, 3mm Drill Bit.
1.
Align two Side Panels (A) together and pre-drill as shown by arrows in Fig 1a. Fix
together using 4no 40mm screws. Repeat to attach subsequent panels to form a
square (tapered) obelisk.
2.
Locate Cap (B) into top of obelisk and fix in position using 4no 40mm screws
(See Figs 2a & 2b).
Ben Nevis Obelisk is now complete.
1a
1c
1b
2a
2b
www.zest4leisure.co.uk